Euless, TX
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Euless, TX
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Alton, IL
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Madison, WI
Average peak power unavailable
8 kW maximum
First tracked Jul 13, 2024
Corinth, MS
85 kW avg peak
125 kW maximum
First tracked Jul 13, 2024
Columbia, TN
84 kW avg peak
125 kW maximum
First tracked Jul 13, 2024
Hoffman Estates, IL
Average peak power unavailable
12 kW maximum
First tracked Jul 13, 2024
Macon, GA
Average peak power unavailable
63 kW maximum
First tracked Jul 13, 2024
Duluth, GA
Average peak power unavailable
10 kW maximum
First tracked Jul 13, 2024
Doral, FL
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Florence, SC
Average peak power unavailable
63 kW maximum
First tracked Jul 13, 2024
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Charlottesville, VA
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Ashland, VA
146 kW avg peak
350 kW maximum
First tracked Jul 13, 2024
Watkins Glen, NY
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Oswego, NY
Average peak power unavailable
19 kW maximum
First tracked Jul 13, 2024
Columbia, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Columbia, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Ottawa, ON
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Egg Harbor Township, NJ
Average peak power unavailable
7 kW maximum
First tracked Jul 13, 2024
Egg Harbor Township, NJ
Average peak power unavailable
12 kW maximum
First tracked Jul 13, 2024
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
DFW AIRPORT DFW IOC EV
Euless, TX
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
ALTON TOYOTA FRONT STATION
Alton, IL
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
STATION 01 HOURLY AND RAMP
Madison, WI
Operational First tracked Jul 13, 2024 |
Operational | — | 8 kW | Jul 13, 2024 |
|
ACEPA ACE STATION
Corinth, MS Reliability B Operational First tracked Jul 13, 2024 |
Operational | 85 kW | 125 kW | Jul 13, 2024 |
|
CPWS1 STATION
Columbia, TN Reliability B Operational First tracked Jul 13, 2024 |
Operational | 84 kW | 125 kW | Jul 13, 2024 |
|
MBHE
Hoffman Estates, IL
Operational First tracked Jul 13, 2024 |
Operational | — | 12 kW | Jul 13, 2024 |
|
FS GENESIS SS GENESIS DC
Macon, GA
Operational First tracked Jul 13, 2024 |
Operational | — | 63 kW | Jul 13, 2024 |
|
TRACKSIDE TRACKSIDE
Duluth, GA
Operational First tracked Jul 13, 2024 |
Operational | — | 10 kW | Jul 13, 2024 |
|
COD EV STATION NEW STATION 2
Doral, FL
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
CHEVY 1 LVL3 EV CHARGER
Florence, SC
Operational First tracked Jul 13, 2024 |
Operational | — | 63 kW | Jul 13, 2024 |
|
CCHARGWPHPGM STATION 4
Pittsburgh, PA
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
HIEX-UVA EV STATION 1
Charlottesville, VA
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
WHITTEN ASHLAND POWER LINK 1
Ashland, VA Reliability A Operational First tracked Jul 13, 2024 |
Operational | 146 kW | 350 kW | Jul 13, 2024 |
|
WGHH CHARGING HOTEL 1
Watkins Glen, NY
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
SHINEMAN SOUTH LEE HALL 4
Oswego, NY
Operational First tracked Jul 13, 2024 |
Operational | — | 19 kW | Jul 13, 2024 |
|
HHC COLUMBIA 50-60 STATION
Columbia, MD
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
HHC COLUMBIA 70 STATION
Columbia, MD
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
AVENUE31CAPITAL STATION 1
Ottawa, ON
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
LEXUS OF AC STATION 1
Egg Harbor Township, NJ
Operational First tracked Jul 13, 2024 |
Operational | — | 7 kW | Jul 13, 2024 |
|
LEXUS OF AC SVC STATION
Egg Harbor Township, NJ
Operational First tracked Jul 13, 2024 |
Operational | — | 12 kW | Jul 13, 2024 |