North Salt Lake, UT
Average peak power unavailable
10 kW maximum
First tracked Aug 30, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
North Salt Lake, UT
Average peak power unavailable
10 kW maximum
First tracked Aug 30, 2024
Rancho Mirage, CA
Average peak power unavailable
8 kW maximum
First tracked Aug 30, 2024
Helena, MT
Average peak power unavailable
63 kW maximum
First tracked Aug 30, 2024
Denton, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 30, 2024
Moline, IL
Average peak power unavailable
7 kW maximum
First tracked Aug 30, 2024
Avon Lake, OH
Average peak power unavailable
350 kW maximum
First tracked Aug 30, 2024
Painesville, OH
Average peak power unavailable
7 kW maximum
First tracked Aug 30, 2024
Guelph, ON
Average peak power unavailable
7 kW maximum
First tracked Aug 30, 2024
Braintree, MA
93 kW avg peak
63 kW maximum
First tracked Aug 30, 2024
Oakley, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Oro Valley, AZ
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Parker, CO
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
St. Louis Park, MN
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Austin, TX
Average peak power unavailable
7 kW maximum
First tracked Aug 31, 2024
Edgewater, MD
Average peak power unavailable
63 kW maximum
First tracked Aug 31, 2024
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
TDNB TDNB EAST
North Salt Lake, UT
Operational First tracked Aug 30, 2024 |
Operational | — | 10 kW | Aug 30, 2024 |
|
SUNNYLANDS
Rancho Mirage, CA
Operational First tracked Aug 30, 2024 |
Operational | — | 8 kW | Aug 30, 2024 |
|
L146
Helena, MT
Operational First tracked Aug 30, 2024 |
Operational | — | 63 kW | Aug 30, 2024 |
|
DCCEVSE DCC
Denton, TX
Operational First tracked Aug 30, 2024 |
Operational | — | 7 kW | Aug 30, 2024 |
|
MOLINE-CH MOLINE-CH
Moline, IL
Operational First tracked Aug 30, 2024 |
Operational | — | 7 kW | Aug 30, 2024 |
|
TOMKO POWER LINK
Avon Lake, OH
Operational First tracked Aug 30, 2024 |
Operational | — | 350 kW | Aug 30, 2024 |
|
OBE THE TOWER
Painesville, OH
Operational First tracked Aug 30, 2024 |
Operational | — | 7 kW | Aug 30, 2024 |
|
COOPERDRIVE EV EASTGATE ST 1
Guelph, ON
Operational First tracked Aug 30, 2024 |
Operational | — | 7 kW | Aug 30, 2024 |
|
QUIRK QUIRK HYUN L3
Braintree, MA Reliability A Operational First tracked Aug 30, 2024 |
Operational | 93 kW | 63 kW | Aug 30, 2024 |
|
OAKLEY CIVIC C1 CHARGER
Oakley, CA
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
PARK I PARK STATION 1
Irvine, CA
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
IRVINE CO OFC ST 17840 6
Irvine, CA
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
LINDA VISTA LUX BLDG
Oro Valley, AZ
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
DHA GREENHAUS
Denver, CO
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
DHA THRIVE
Denver, CO
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
DHA GREENHAUS
Denver, CO
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
CLA LATHAMBUILDING2
Parker, CO
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
ST LOUIS PARK MSC STATION
St. Louis Park, MN
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
APH CHARGER
Austin, TX
Operational First tracked Aug 31, 2024 |
Operational | — | 7 kW | Aug 31, 2024 |
|
ANNAPOLIS HYNDA CPE250 1
Edgewater, MD
Operational First tracked Aug 31, 2024 |
Operational | — | 63 kW | Aug 31, 2024 |