Klamath, CA
63 kW avg peak
63 kW maximum
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Klamath, CA
63 kW avg peak
63 kW maximum
Philomath, OR
Average peak power unavailable
7 kW maximum
Corvallis, OR
Average peak power unavailable
7 kW maximum
Corvallis, OR
Average peak power unavailable
7 kW maximum
Corvallis, OR
Average peak power unavailable
7 kW maximum
Corvallis, OR
Average peak power unavailable
7 kW maximum
Corvallis, OR
Average peak power unavailable
7 kW maximum
Corvallis, OR
Average peak power unavailable
7 kW maximum
Salem, OR
Average peak power unavailable
7 kW maximum
Salem, OR
85 kW avg peak
63 kW maximum
Salem, OR
Average peak power unavailable
7 kW maximum
Salem, OR
72 kW avg peak
125 kW maximum
Salem, OR
72 kW avg peak
125 kW maximum
Salem, OR
Average peak power unavailable
7 kW maximum
Portland, OR
Average peak power unavailable
7 kW maximum
Ridgefield, WA
Average peak power unavailable
7 kW maximum
Ridgefield, WA
Average peak power unavailable
7 kW maximum
Vancouver, WA
Average peak power unavailable
7 kW maximum
Vancouver, WA
Average peak power unavailable
7 kW maximum
Vancouver, WA
Average peak power unavailable
7 kW maximum
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
GF4EVA KLAMATH DC
Klamath, CA Reliability C Unknown |
Unknown | 63 kW | 63 kW | — |
|
CPI PHILOMATH
Philomath, OR
Operational |
Operational | — | 7 kW | — |
|
CSD B.COLEMAN STA 1
Corvallis, OR
Operational |
Operational | — | 7 kW | — |
|
CSD CVHS STATION 1
Corvallis, OR
Operational |
Operational | — | 7 kW | — |
|
OSU LPSC
Corvallis, OR
Operational |
Operational | — | 7 kW | — |
|
OSU FAIRBANKS NORTH
Corvallis, OR
Operational |
Operational | — | 7 kW | — |
|
OSU FAIRBANKS SOUTH
Corvallis, OR
Operational |
Operational | — | 7 kW | — |
|
CSD GARFIELD STA 1
Corvallis, OR
Operational |
Operational | — | 7 kW | — |
|
L242 CPF50
Salem, OR
Operational |
Operational | — | 7 kW | — |
|
MB-CP-01
Salem, OR Reliability A Operational |
Operational | 85 kW | 63 kW | — |
|
BISHOP STEINER BISHOP STEINER
Salem, OR
Operational |
Operational | — | 7 kW | — |
|
WEST
Salem, OR Reliability C Operational |
Operational | 72 kW | 125 kW | — |
|
WEST WEST 3
Salem, OR Reliability C Operational |
Operational | 72 kW | 125 kW | — |
|
OSH OSH
Salem, OR
Operational |
Operational | — | 7 kW | — |
|
CHARGEPOINT BW PORT
Portland, OR
Unknown |
Unknown | — | 7 kW | — |
|
RIDGEFIELD NWR STATION 1
Ridgefield, WA
Operational |
Operational | — | 7 kW | — |
|
DAVIS PARK STATION 1
Ridgefield, WA
Operational |
Operational | — | 7 kW | — |
|
HOTEL INDIGO B1: LEFT
Vancouver, WA
Operational |
Operational | — | 7 kW | — |
|
COEN NORTH STATION #2
Vancouver, WA
Operational |
Operational | — | 7 kW | — |
|
COEN NORTH STATION #1
Vancouver, WA
Operational |
Operational | — | 7 kW | — |