Nashville, TN
Average peak power unavailable
12 kW maximum
First tracked Aug 17, 2026
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Nashville, TN
Average peak power unavailable
12 kW maximum
First tracked Aug 17, 2026
Miami Beach, FL
Average peak power unavailable
13 kW maximum
First tracked Aug 16, 2026
Grinnell, IA
Average peak power unavailable
19 kW maximum
First tracked Aug 14, 2026
Grinnell, IA
Average peak power unavailable
19 kW maximum
First tracked Aug 14, 2026
Batesville, MS
Average peak power unavailable
500 kW maximum
First tracked Aug 14, 2026
Superior, WI
Average peak power unavailable
250 kW maximum
First tracked Aug 14, 2026
Caret, VA
Average peak power unavailable
19 kW maximum
First tracked Aug 13, 2026
Vancouver, BC
Average peak power unavailable
19 kW maximum
First tracked Aug 13, 2026
Vancouver, BC
Average peak power unavailable
19 kW maximum
First tracked Aug 13, 2026
Glencoe, IL
Average peak power unavailable
12 kW maximum
First tracked Aug 13, 2026
Portland, OR
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2026
Lathrop, CA
147 kW avg peak
350 kW maximum
First tracked Aug 13, 2026
Austin, TX
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2026
Queensbury, NY
Average peak power unavailable
19 kW maximum
First tracked Aug 12, 2026
Brampton, ON
Average peak power unavailable
10 kW maximum
First tracked Aug 12, 2026
Grinnell, IA
Average peak power unavailable
19 kW maximum
First tracked Aug 12, 2026
Lathrop, CA
147 kW avg peak
350 kW maximum
First tracked Aug 12, 2026
Placerville, CA
Average peak power unavailable
8 kW maximum
First tracked Aug 11, 2026
Orem, UT
50 kW avg peak
500 kW maximum
First tracked Aug 11, 2026
Indianola, IA
Average peak power unavailable
19 kW maximum
First tracked Aug 11, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
TERRACE GARAGE 25TH GARAGE
Nashville, TN
Operational First tracked Aug 17, 2026 |
Operational | — | 12 kW | Aug 17, 2026 |
|
OBE COSTA BRAVA 6K1
Miami Beach, FL
Operational First tracked Aug 16, 2026 |
Operational | — | 13 kW | Aug 16, 2026 |
|
GRINNELLCOLLEGE STATION 5
Grinnell, IA
Operational First tracked Aug 14, 2026 |
Operational | — | 19 kW | Aug 14, 2026 |
|
GRINNELLCOLLEGE STATION 4
Grinnell, IA
Operational First tracked Aug 14, 2026 |
Operational | — | 19 kW | Aug 14, 2026 |
|
TVEPA STATION
Batesville, MS
Operational First tracked Aug 14, 2026 |
Operational | — | 500 kW | Aug 14, 2026 |
|
KARI TOYOTA #1 L3 #1
Superior, WI
Operational First tracked Aug 14, 2026 |
Operational | — | 250 kW | Aug 14, 2026 |
|
RECOMM CARET 1
Caret, VA
Operational First tracked Aug 13, 2026 |
Operational | — | 19 kW | Aug 13, 2026 |
|
CITYOFVANCOUVER JERICHO1 NORTH
Vancouver, BC
Operational First tracked Aug 13, 2026 |
Operational | — | 19 kW | Aug 13, 2026 |
|
CITYOFVANCOUVER JERICHO
Vancouver, BC
Operational First tracked Aug 13, 2026 |
Operational | — | 19 kW | Aug 13, 2026 |
|
TAKIFF CENTER TAKIFF #1
Glencoe, IL
Operational First tracked Aug 13, 2026 |
Operational | — | 12 kW | Aug 13, 2026 |
|
SVC ENTRANCE CPE250
Portland, OR
Operational First tracked Aug 13, 2026 |
Operational | — | 63 kW | Aug 13, 2026 |
|
CHEVRON) F&E CHEVRON 3
Lathrop, CA Reliability C Operational First tracked Aug 13, 2026 |
Operational | 147 kW | 350 kW | Aug 13, 2026 |
|
COA FLEET MARSH YARD
Austin, TX
Operational First tracked Aug 13, 2026 |
Operational | — | 63 kW | Aug 13, 2026 |
|
KIA EVSE 19KW EVSE
Queensbury, NY
Unknown First tracked Aug 12, 2026 |
Unknown | — | 19 kW | Aug 12, 2026 |
|
METROSCG METRO SC WB 2
Brampton, ON
Operational First tracked Aug 12, 2026 |
Operational | — | 10 kW | Aug 12, 2026 |
|
GRINNELLCOLLEGE STATION 3
Grinnell, IA
Unknown First tracked Aug 12, 2026 |
Unknown | — | 19 kW | Aug 12, 2026 |
|
CHEVRON) F
Lathrop, CA Reliability C Operational First tracked Aug 12, 2026 |
Operational | 147 kW | 350 kW | Aug 12, 2026 |
|
EL DORADO PVILLE LIB
Placerville, CA
Operational First tracked Aug 11, 2026 |
Operational | — | 8 kW | Aug 11, 2026 |
|
CC STATION1 CPPL0002
Orem, UT Reliability C Operational First tracked Aug 11, 2026 |
Operational | 50 kW | 500 kW | Aug 11, 2026 |
|
DOWNTOWN SQR INDIANOLA 215
Indianola, IA
Operational First tracked Aug 11, 2026 |
Operational | — | 19 kW | Aug 11, 2026 |