Atlantic City, NJ
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Atlantic City, NJ
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Kaysville, UT
Average peak power unavailable
13 kW maximum
First tracked Apr 17, 2026
Sumter, SC
Average peak power unavailable
350 kW maximum
First tracked Apr 17, 2026
Lynchburg, SC
87 kW avg peak
350 kW maximum
First tracked Apr 17, 2026
Fayetteville, GA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Oakland, CA
Average peak power unavailable
4 kW maximum
First tracked Apr 17, 2026
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Spring Valley, CA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Pullman, WA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Pullman, WA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Marysville, WA
Average peak power unavailable
8 kW maximum
First tracked Apr 17, 2026
Bellevue, WA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Tulalip Bay, WA
Average peak power unavailable
8 kW maximum
First tracked Apr 17, 2026
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Shoreview, MN
Average peak power unavailable
10 kW maximum
First tracked Apr 17, 2026
Barnstable, MA
169 kW avg peak
500 kW maximum
First tracked Apr 17, 2026
Pennington, NJ
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
Denver, CO
Average peak power unavailable
7 kW maximum
First tracked Apr 17, 2026
East Windsor, NJ
Average peak power unavailable
7 kW maximum
First tracked Apr 16, 2026
Riverside, NJ
Average peak power unavailable
7 kW maximum
First tracked Apr 16, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
OCR OCEAN CHARG
Atlantic City, NJ
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
DAVISTECH WELDING
Kaysville, UT
Operational First tracked Apr 17, 2026 |
Operational | — | 13 kW | Apr 17, 2026 |
|
OPTIMUS CPO BTC SUMTER
Sumter, SC
Operational First tracked Apr 17, 2026 |
Operational | — | 350 kW | Apr 17, 2026 |
|
OPTIMUS CPO BTC LYNCHBURG
Lynchburg, SC Reliability F Operational First tracked Apr 17, 2026 |
Operational | 87 kW | 350 kW | Apr 17, 2026 |
|
PF PARKING LOT U
Fayetteville, GA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
CPF50 REAR CPF50 REAR
Oakland, CA
Operational First tracked Apr 17, 2026 |
Operational | — | 4 kW | Apr 17, 2026 |
|
PARKLANE PARKLANE EV
Houston, TX
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
DGS ARC 7 SPRNG VLY
Spring Valley, CA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
COP_ CITY HALL NO. 2
Pullman, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
COP_ CITY HALL NO
Pullman, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
TULALIP AD-4
Marysville, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 8 kW | Apr 17, 2026 |
|
MADRONA MADRONA
Bellevue, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
TULALIP AD
Tulalip Bay, WA
Operational First tracked Apr 17, 2026 |
Operational | — | 8 kW | Apr 17, 2026 |
|
CITY OF BOSTON MUNI LOT 15
Boston, MA
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
SHOREVIEW BOBBY-THEISEN
Shoreview, MN
Operational First tracked Apr 17, 2026 |
Operational | — | 10 kW | Apr 17, 2026 |
|
MASSDOT
Barnstable, MA Reliability A Operational First tracked Apr 17, 2026 |
Operational | 169 kW | 500 kW | Apr 17, 2026 |
|
COLLECTION #1 COLLECTION #1
Pennington, NJ
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
FH VALET P1 VALET P1
Denver, CO
Operational First tracked Apr 17, 2026 |
Operational | — | 7 kW | Apr 17, 2026 |
|
HOV_EV_CHRG HOV_EV_CHRG
East Windsor, NJ
Operational First tracked Apr 16, 2026 |
Operational | — | 7 kW | Apr 16, 2026 |
|
TMARUR BUILDING E
Riverside, NJ
Operational First tracked Apr 16, 2026 |
Operational | — | 7 kW | Apr 16, 2026 |