24,383
Sites
84
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

BHE COUNTRY WALK ED

Miami, FL

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 15, 2024

BHE CORAL WAY OCED

Miami, FL

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 15, 2024

OS MANAGED MADISON TRAIL

Lawrenceville, GA

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 15, 2024

COLUMBIA M LOT CITY HALL

Columbia, KY

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 15, 2024

HY VEE OLATHE 1

Olathe, KS

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 15, 2024

MHS1LOADING DOC STATION 2

Jourdanton, TX

Operational

Average peak power unavailable

12 kW maximum

First tracked Aug 15, 2024

NVTA IMOLA P&R

Napa, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 15, 2024

BCES STATION

Camden, TN

Unknown Reliability A

89 kW avg peak

125 kW maximum

First tracked Aug 15, 2024

RRBPARKING

Washington, DC

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 14, 2024

HOLLOWAY CO SL

Ottawa, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 14, 2024

HOLLOWAY CO SL STATION 1

Ottawa, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 14, 2024

SOUTH GARAGE G-1

Pittsburgh, PA

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 14, 2024

FMCTA FAST CHARGER

Fairmont, WV

Operational Reliability B

62 kW avg peak

63 kW maximum

First tracked Aug 14, 2024

BHE BHH DORAL

Doral, FL

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 14, 2024

FOUNDATION FOUNDATION

Champaign, IL

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 14, 2024

MT DIABLO MT DIABLO

Walnut Creek, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 14, 2024

BROADSTREET WILLOWS

Duncan, BC

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 14, 2024

UNIVERSE 1 HU ABB

Lakewood, NJ

Operational

Average peak power unavailable

24 kW maximum

First tracked Aug 13, 2024

Page 413 of 1220

This action cannot be undone.