Brown Deer, WI
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Brown Deer, WI
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
Branson, MO
91 kW avg peak
180 kW maximum
First tracked Jul 9, 2024
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
Paramus, NJ
Average peak power unavailable
13 kW maximum
First tracked Jul 9, 2024
Parsippany-Troy Hills, NJ
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
Beaver, PA
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
McCordsville, IN
Average peak power unavailable
63 kW maximum
First tracked Jul 9, 2024
Corona, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 9, 2024
Warren, OR
88 kW avg peak
125 kW maximum
First tracked Jul 9, 2024
Raleigh, NC
Average peak power unavailable
7 kW maximum
First tracked Jul 8, 2024
Boca Raton, FL
Average peak power unavailable
12 kW maximum
First tracked Jul 8, 2024
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 8, 2024
South Burlington, VT
Average peak power unavailable
7 kW maximum
First tracked Jul 6, 2024
South Burlington, VT
Average peak power unavailable
7 kW maximum
First tracked Jul 6, 2024
Gatineau, QC
Average peak power unavailable
63 kW maximum
First tracked Jul 6, 2024
Gatineau, QC
Average peak power unavailable
7 kW maximum
First tracked Jul 6, 2024
Turlock, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 6, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
BADGER STATIONS
Brown Deer, WI
Operational First tracked Jul 9, 2024 |
Operational | — | 7 kW | Jul 9, 2024 |
|
LIBERTY EMPIRE BRANSON ABB
Branson, MO Reliability F Operational First tracked Jul 9, 2024 |
Operational | 91 kW | 180 kW | Jul 9, 2024 |
|
1011 UNION STATION 02
San Diego, CA
Operational First tracked Jul 9, 2024 |
Operational | — | 7 kW | Jul 9, 2024 |
|
BUNKER HILL CC 3
Boston, MA
Operational First tracked Jul 9, 2024 |
Operational | — | 7 kW | Jul 9, 2024 |
|
BUNKER HILL CC
Boston, MA
Operational First tracked Jul 9, 2024 |
Operational | — | 7 kW | Jul 9, 2024 |
|
L703 CP6K
Paramus, NJ
Operational First tracked Jul 9, 2024 |
Operational | — | 13 kW | Jul 9, 2024 |
|
TIFFANY CHARGEPOINT 2
Parsippany-Troy Hills, NJ
Unknown First tracked Jul 9, 2024 |
Unknown | — | 7 kW | Jul 9, 2024 |
|
BEAVER COUNTY COURTHOUSE
Beaver, PA
Operational First tracked Jul 9, 2024 |
Operational | — | 7 kW | Jul 9, 2024 |
|
NINESTAR LEOS GAS STATIO
McCordsville, IN
Operational First tracked Jul 9, 2024 |
Operational | — | 63 kW | Jul 9, 2024 |
|
CORONA GATEWAY STATION #1
Corona, CA
Operational First tracked Jul 9, 2024 |
Operational | — | 7 kW | Jul 9, 2024 |
|
1011 UNION STATION
San Diego, CA
Operational First tracked Jul 9, 2024 |
Operational | — | 7 kW | Jul 9, 2024 |
|
CRPUD SCAPPOOSEBAYDC
Warren, OR Reliability C Operational First tracked Jul 9, 2024 |
Operational | 88 kW | 125 kW | Jul 9, 2024 |
|
THE PIEDMONT BLDG 6
Raleigh, NC
Operational First tracked Jul 8, 2024 |
Operational | — | 7 kW | Jul 8, 2024 |
|
ZNT EV ZNT
Boca Raton, FL
Unknown First tracked Jul 8, 2024 |
Unknown | — | 12 kW | Jul 8, 2024 |
|
ALBERTACOS MEXICAN FOOD
Riverside, CA
Operational First tracked Jul 8, 2024 |
Operational | — | 7 kW | Jul 8, 2024 |
|
CHARGE WITH US 99 SWIFT
South Burlington, VT
Operational First tracked Jul 6, 2024 |
Operational | — | 7 kW | Jul 6, 2024 |
|
CHARGE WITH US 38 EASTWOOD
South Burlington, VT
Operational First tracked Jul 6, 2024 |
Operational | — | 7 kW | Jul 6, 2024 |
|
IMM. BUCKINGHAM NIVEAU 3
Gatineau, QC
Operational First tracked Jul 6, 2024 |
Operational | — | 63 kW | Jul 6, 2024 |
|
IMM. BUCKINGHAM NIVEAU 2
Gatineau, QC
Operational First tracked Jul 6, 2024 |
Operational | — | 7 kW | Jul 6, 2024 |
|
WEST MAIN ST MAIN ST
Turlock, CA
Operational First tracked Jul 6, 2024 |
Operational | — | 7 kW | Jul 6, 2024 |