Roseville, CA
Average peak power unavailable
7 kW maximum
First tracked Jun 2, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Roseville, CA
Average peak power unavailable
7 kW maximum
First tracked Jun 2, 2024
Truckee, CA
70 kW avg peak
63 kW maximum
First tracked Jun 2, 2024
Walnut Creek, CA
Average peak power unavailable
7 kW maximum
First tracked Jun 2, 2024
Rodanthe, NC
Average peak power unavailable
13 kW maximum
First tracked Jun 2, 2024
Charlevoix, MI
Average peak power unavailable
19 kW maximum
First tracked Jun 2, 2024
San Juan, PR
Average peak power unavailable
7 kW maximum
Buxton, NC
Average peak power unavailable
7 kW maximum
Hatteras, NC
Average peak power unavailable
7 kW maximum
Avon, NC
88 kW avg peak
125 kW maximum
Avon, NC
88 kW avg peak
125 kW maximum
Beaufort, NC
Average peak power unavailable
7 kW maximum
Kitty Hawk, NC
Average peak power unavailable
7 kW maximum
Kill Devil Hills, NC
Average peak power unavailable
7 kW maximum
Nags Head, NC
Average peak power unavailable
7 kW maximum
Havelock, NC
Average peak power unavailable
7 kW maximum
Havelock, NC
Average peak power unavailable
7 kW maximum
Oriental, NC
Average peak power unavailable
7 kW maximum
Oriental, NC
Average peak power unavailable
7 kW maximum
Morehead City, NC
Average peak power unavailable
7 kW maximum
Virginia Beach, VA
44 kW avg peak
63 kW maximum
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
ROSEVILLE ROS CHARGER
Roseville, CA
Operational First tracked Jun 2, 2024 |
Operational | — | 7 kW | Jun 2, 2024 |
|
DC CORRIDOR TRUCKEE
Truckee, CA Reliability C Operational First tracked Jun 2, 2024 |
Operational | 70 kW | 63 kW | Jun 2, 2024 |
|
JOHN MUIR HLTH B PAVILLION
Walnut Creek, CA
Operational First tracked Jun 2, 2024 |
Operational | — | 7 kW | Jun 2, 2024 |
|
PAMLICO STATION PAMLICOSTATION1
Rodanthe, NC
Operational First tracked Jun 2, 2024 |
Operational | — | 13 kW | Jun 2, 2024 |
|
MASON STREET MASON STREET
Charlevoix, MI
Operational First tracked Jun 2, 2024 |
Operational | — | 19 kW | Jun 2, 2024 |
|
JLR SAN JUAN SHOP02
San Juan, PR
Operational |
Operational | — | 7 kW | — |
|
CAPE HATTERAS LIGHTHOUSE
Buxton, NC
Operational |
Operational | — | 7 kW | — |
|
CAPE HATTERAS HATTERAS
Hatteras, NC
Operational |
Operational | — | 7 kW | — |
|
CAPE HATTERAS AVON DC FAST
Avon, NC Reliability C Operational |
Operational | 88 kW | 125 kW | — |
|
CAPE HATTERAS AVON PIER DCFC2
Avon, NC Reliability C Operational |
Operational | 88 kW | 125 kW | — |
|
TOWN CREEK PARKING LOT #1
Beaufort, NC
Operational |
Operational | — | 7 kW | — |
|
TOSS EVS SOUTHERN SHORES
Kitty Hawk, NC
Operational |
Operational | — | 7 kW | — |
|
RAMADA PLAZA RAMADA PLAZA
Kill Devil Hills, NC
Operational |
Operational | — | 7 kW | — |
|
EC STATION CROATAN HWY 1
Nags Head, NC
Operational |
Operational | — | 7 kW | — |
|
HAVELOCK NC CITY HALL
Havelock, NC
Operational |
Operational | — | 7 kW | — |
|
HAVELOCK NC PARKS AND REC
Havelock, NC
Operational |
Operational | — | 7 kW | — |
|
ORIENTAL S1 TOWN HALL
Oriental, NC
Operational |
Operational | — | 7 kW | — |
|
ORIENTAL S1 ORIENTAL MARINA
Oriental, NC
Operational |
Operational | — | 7 kW | — |
|
UCF ON BRIDGES UCF
Morehead City, NC
Operational |
Operational | — | 7 kW | — |
|
CHECKERED FLAG
Virginia Beach, VA Reliability A Operational |
Operational | 44 kW | 63 kW | — |