Rosedale, MD
Average peak power unavailable
24 kW maximum
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Rosedale, MD
Average peak power unavailable
24 kW maximum
Nottingham, MD
Average peak power unavailable
7 kW maximum
Nottingham, MD
Average peak power unavailable
7 kW maximum
Nottingham, MD
Average peak power unavailable
7 kW maximum
Middle River, MD
Average peak power unavailable
7 kW maximum
Bel Air, MD
Average peak power unavailable
7 kW maximum
Bel Air, MD
Average peak power unavailable
7 kW maximum
Darlington, MD
Average peak power unavailable
7 kW maximum
Darlington, MD
Average peak power unavailable
7 kW maximum
Joppatowne, MD
Average peak power unavailable
7 kW maximum
Bel Air, MD
Average peak power unavailable
7 kW maximum
Abingdon, MD
62 kW avg peak
63 kW maximum
Bel Air, MD
Average peak power unavailable
7 kW maximum
Bel Air, MD
Average peak power unavailable
7 kW maximum
Aberdeen, MD
Average peak power unavailable
7 kW maximum
Aberdeen, MD
Average peak power unavailable
7 kW maximum
Lancaster, PA
Average peak power unavailable
7 kW maximum
East Petersburg, PA
Average peak power unavailable
7 kW maximum
East Petersburg, PA
58 kW avg peak
63 kW maximum
East Petersburg, PA
58 kW avg peak
63 kW maximum
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
H-D BALTIMORE DCFAST HOG
Rosedale, MD
Unknown |
Unknown | — | 24 kW | — |
|
IKEA USA BALTIMORE-DC
Nottingham, MD
Operational |
Operational | — | 7 kW | — |
|
MARSH
Nottingham, MD
Operational |
Operational | — | 7 kW | — |
|
BGE WORKPLACE PARRY HALL BGE
Nottingham, MD
Operational |
Operational | — | 7 kW | — |
|
MTA MARC MARTIN AIR
Middle River, MD
Operational |
Operational | — | 7 kW | — |
|
JTOY TOYOTA SIDE
Bel Air, MD
Operational |
Operational | — | 7 kW | — |
|
BMW OF BEL AIR STATION SA01
Bel Air, MD
Unknown |
Unknown | — | 7 kW | — |
|
CONOWINGO DAM CONOWINGO FISHE
Darlington, MD
Operational |
Operational | — | 7 kW | — |
|
CONOWINGO DAM CONOWINGO EMPLO
Darlington, MD
Operational |
Operational | — | 7 kW | — |
|
BGE MUD THE POINTE 2
Joppatowne, MD
Operational |
Operational | — | 7 kW | — |
|
SHIRLEN BDG BEL AIR SOUTH
Bel Air, MD
Operational |
Operational | — | 7 kW | — |
|
EVROADWAY BOX HILL
Abingdon, MD Reliability F Operational |
Operational | 62 kW | 63 kW | — |
|
HGIBELAIR LEFT STATION
Bel Air, MD
Operational |
Operational | — | 7 kW | — |
|
HGIBELAIR RIGHT STATION
Bel Air, MD
Unknown |
Unknown | — | 7 kW | — |
|
FIELDSIDEGRANDE FG4
Aberdeen, MD
Operational |
Operational | — | 7 kW | — |
|
FIELDSIDEGRANDE FG3
Aberdeen, MD
Operational |
Operational | — | 7 kW | — |
|
MBOL MBOL VAN CENTER
Lancaster, PA
Operational |
Operational | — | 7 kW | — |
|
MZCHARGEPT TOYOTA CT4K 1
East Petersburg, PA
Operational |
Operational | — | 7 kW | — |
|
T FC
East Petersburg, PA Reliability A Operational |
Operational | 58 kW | 63 kW | — |
|
MBOL FRONT S
East Petersburg, PA Reliability A Operational |
Operational | 58 kW | 63 kW | — |