Kirkland, WA
Average peak power unavailable
7 kW maximum
First tracked Feb 11, 2026
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Kirkland, WA
Average peak power unavailable
7 kW maximum
First tracked Feb 11, 2026
Westerville, OH
Average peak power unavailable
8 kW maximum
First tracked Feb 11, 2026
Decatur, IL
Average peak power unavailable
63 kW maximum
First tracked Feb 11, 2026
Boca Raton, FL
Average peak power unavailable
63 kW maximum
First tracked Feb 11, 2026
Boca Raton, FL
Average peak power unavailable
63 kW maximum
First tracked Feb 11, 2026
Castro Valley, CA
Average peak power unavailable
19 kW maximum
First tracked Feb 10, 2026
Wytheville, VA
Average peak power unavailable
7 kW maximum
First tracked Feb 10, 2026
Annapolis, MD
Average peak power unavailable
7 kW maximum
First tracked Feb 10, 2026
Decatur, IL
Average peak power unavailable
63 kW maximum
First tracked Feb 10, 2026
Lone Tree, CO
Average peak power unavailable
4 kW maximum
First tracked Feb 10, 2026
Chester, VA
Average peak power unavailable
10 kW maximum
First tracked Feb 10, 2026
Tuskegee, AL
Average peak power unavailable
63 kW maximum
First tracked Feb 10, 2026
Jacksonville, FL
Average peak power unavailable
7 kW maximum
First tracked Feb 10, 2026
San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Feb 10, 2026
Novato, CA
110 kW avg peak
250 kW maximum
First tracked Feb 10, 2026
Boca Raton, FL
Average peak power unavailable
19 kW maximum
First tracked Feb 10, 2026
Thatcher, AZ
Average peak power unavailable
8 kW maximum
First tracked Feb 10, 2026
Thatcher, AZ
Average peak power unavailable
8 kW maximum
First tracked Feb 10, 2026
Houston, TX
Average peak power unavailable
7 kW maximum
First tracked Feb 9, 2026
Old Orchard Beach, ME
Average peak power unavailable
8 kW maximum
First tracked Feb 9, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
KRKLAND HEIGHTS OFFICE 2
Kirkland, WA
Operational First tracked Feb 11, 2026 |
Operational | — | 7 kW | Feb 11, 2026 |
|
VC ACRES VC ACRES 2
Westerville, OH
Operational First tracked Feb 11, 2026 |
Operational | — | 8 kW | Feb 11, 2026 |
|
CITY OF DECATUR LIBRARY
Decatur, IL
Operational First tracked Feb 11, 2026 |
Operational | — | 63 kW | Feb 11, 2026 |
|
FERRARI BOCA 1 FERRARI BOCA 1
Boca Raton, FL
Operational First tracked Feb 11, 2026 |
Operational | — | 63 kW | Feb 11, 2026 |
|
FERRARI BOCA 1 FERRARI BOCA 2
Boca Raton, FL
Operational First tracked Feb 11, 2026 |
Operational | — | 63 kW | Feb 11, 2026 |
|
CVSAN EV STATION
Castro Valley, CA
Operational First tracked Feb 10, 2026 |
Operational | — | 19 kW | Feb 10, 2026 |
|
BOLLING WILSON GRAZE ON MAIN
Wytheville, VA
Operational First tracked Feb 10, 2026 |
Operational | — | 7 kW | Feb 10, 2026 |
|
MD HOD HOD STATION 7
Annapolis, MD
Unknown First tracked Feb 10, 2026 |
Unknown | — | 7 kW | Feb 10, 2026 |
|
CITY OF DECATUR CIVIC CENTER
Decatur, IL
Operational First tracked Feb 10, 2026 |
Operational | — | 63 kW | Feb 10, 2026 |
|
THE LINCOLN APT THE LINCOLN APT
Lone Tree, CO
Operational First tracked Feb 10, 2026 |
Operational | — | 4 kW | Feb 10, 2026 |
|
DUAL HOTEL CHESTNUT HILL
Chester, VA
Operational First tracked Feb 10, 2026 |
Operational | — | 10 kW | Feb 10, 2026 |
|
UBT TUSKEGEE UBT
Tuskegee, AL
Operational First tracked Feb 10, 2026 |
Operational | — | 63 kW | Feb 10, 2026 |
|
DEERWOOD FOREST ST 001
Jacksonville, FL
Operational First tracked Feb 10, 2026 |
Operational | — | 7 kW | Feb 10, 2026 |
|
SMCCD CSM LOT U-B1
San Mateo, CA
Operational First tracked Feb 10, 2026 |
Operational | — | 7 kW | Feb 10, 2026 |
|
EVROADWAY VO #8
Novato, CA Reliability A Operational First tracked Feb 10, 2026 |
Operational | 110 kW | 250 kW | Feb 10, 2026 |
|
PATCH REEF PARK STATION
Boca Raton, FL
Operational First tracked Feb 10, 2026 |
Operational | — | 19 kW | Feb 10, 2026 |
|
TUSTT EV2 RIGHT
Thatcher, AZ
Operational First tracked Feb 10, 2026 |
Operational | — | 8 kW | Feb 10, 2026 |
|
TUSTT EV
Thatcher, AZ
Operational First tracked Feb 10, 2026 |
Operational | — | 8 kW | Feb 10, 2026 |
|
RICE U. 1700 BLVD ST1
Houston, TX
Operational First tracked Feb 9, 2026 |
Operational | — | 7 kW | Feb 9, 2026 |
|
OOB CHAMBER STATION 2
Old Orchard Beach, ME
Operational First tracked Feb 9, 2026 |
Operational | — | 8 kW | Feb 9, 2026 |