Calgary, AB
Average peak power unavailable
15 kW maximum
First tracked Jun 1, 2026
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Calgary, AB
Average peak power unavailable
15 kW maximum
First tracked Jun 1, 2026
Shelbyville, TN
Average peak power unavailable
125 kW maximum
First tracked Jun 1, 2026
Van, TX
Average peak power unavailable
500 kW maximum
First tracked May 30, 2026
Mineral, WA
Average peak power unavailable
125 kW maximum
First tracked May 29, 2026
Kitchener, ON
Average peak power unavailable
19 kW maximum
First tracked May 27, 2026
West Haven, CT
Average peak power unavailable
500 kW maximum
First tracked May 27, 2026
Memphis, TN
Average peak power unavailable
250 kW maximum
First tracked May 27, 2026
Ames, IA
Average peak power unavailable
15 kW maximum
First tracked May 26, 2026
Arlington, VA
Average peak power unavailable
19 kW maximum
First tracked May 26, 2026
Arlington, VA
Average peak power unavailable
19 kW maximum
First tracked May 26, 2026
Fountain Valley, CA
Average peak power unavailable
8 kW maximum
First tracked May 26, 2026
Vancouver, BC
147 kW avg peak
350 kW maximum
First tracked May 26, 2026
Houston, TX
Average peak power unavailable
12 kW maximum
First tracked May 23, 2026
Pueblo, CO
Average peak power unavailable
63 kW maximum
First tracked May 22, 2026
Bloomington, MN
Average peak power unavailable
8 kW maximum
First tracked May 22, 2026
Shepherdsville, KY
206 kW avg peak
500 kW maximum
First tracked May 22, 2026
Penetanguishene, ON
Average peak power unavailable
13 kW maximum
First tracked May 21, 2026
Hot Springs, AR
90 kW avg peak
125 kW maximum
First tracked May 20, 2026
Fremont, OH
Average peak power unavailable
22 kW maximum
First tracked May 20, 2026
Troy, NY
Average peak power unavailable
63 kW maximum
First tracked May 19, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
CHARLESGLEN SHOWROOM FRONT
Calgary, AB
Operational First tracked Jun 1, 2026 |
Operational | — | 15 kW | Jun 1, 2026 |
|
SPWS DC CHARGER STATION
Shelbyville, TN
Operational First tracked Jun 1, 2026 |
Operational | — | 125 kW | Jun 1, 2026 |
|
LOVE'S 287 - TX #287 DC
Van, TX
Operational First tracked May 30, 2026 |
Operational | — | 500 kW | May 30, 2026 |
|
LC TRANSIT MINERAL
Mineral, WA
Operational First tracked May 29, 2026 |
Operational | — | 125 kW | May 29, 2026 |
|
WRDSB HURON HEIGHTS 1
Kitchener, ON
Unknown First tracked May 27, 2026 |
Unknown | — | 19 kW | May 27, 2026 |
|
GPM INVESTMENTS 315 DC
West Haven, CT
Operational First tracked May 27, 2026 |
Operational | — | 500 kW | May 27, 2026 |
|
MLGW ORLEANS
Memphis, TN
Operational First tracked May 27, 2026 |
Operational | — | 250 kW | May 27, 2026 |
|
AMES EV LOT N PUBLIC
Ames, IA
Operational First tracked May 26, 2026 |
Operational | — | 15 kW | May 26, 2026 |
|
VHC HEALTH ZONE E PUBLIC 1
Arlington, VA
Operational First tracked May 26, 2026 |
Operational | — | 19 kW | May 26, 2026 |
|
VHC HEALTH ZONE E PUBLIC 1
Arlington, VA
Unknown First tracked May 26, 2026 |
Unknown | — | 19 kW | May 26, 2026 |
|
HMA NHQ F2 STATION 03
Fountain Valley, CA
Unknown First tracked May 26, 2026 |
Unknown | — | 8 kW | May 26, 2026 |
|
MARINE CHRYSLER L
Vancouver, BC Reliability B Operational First tracked May 26, 2026 |
Operational | 147 kW | 350 kW | May 26, 2026 |
|
KGBSH
Houston, TX
Operational First tracked May 23, 2026 |
Operational | — | 12 kW | May 23, 2026 |
|
SPRADLEY CHEVY SHYUNDAI
Pueblo, CO
Operational First tracked May 22, 2026 |
Operational | — | 63 kW | May 22, 2026 |
|
BLOOMINGTON CIVIC PLAZA 1
Bloomington, MN
Operational First tracked May 22, 2026 |
Operational | — | 8 kW | May 22, 2026 |
|
LOVE'S 238 - KY #238 DC
Shepherdsville, KY Reliability A Operational First tracked May 22, 2026 |
Operational | 206 kW | 500 kW | May 22, 2026 |
|
GEORGIAN LTC GEORGIAN LTC
Penetanguishene, ON
Operational First tracked May 21, 2026 |
Operational | — | 13 kW | May 21, 2026 |
|
FRANKLINS 3-4 FRANKLIN HS
Hot Springs, AR Reliability C Operational First tracked May 20, 2026 |
Operational | 90 kW | 125 kW | May 20, 2026 |
|
TSCC TERRACH1 RIGHT
Fremont, OH
Operational First tracked May 20, 2026 |
Operational | — | 22 kW | May 20, 2026 |
|
L751 L751
Troy, NY
Operational First tracked May 19, 2026 |
Operational | — | 63 kW | May 19, 2026 |