Fort Lauderdale, FL
Average peak power unavailable
12 kW maximum
First tracked May 4, 2026
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Fort Lauderdale, FL
Average peak power unavailable
12 kW maximum
First tracked May 4, 2026
Contrecoeur, QC
Average peak power unavailable
350 kW maximum
First tracked May 2, 2026
Greencastle, PA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Edmonton, AB
Average peak power unavailable
40 kW maximum
First tracked May 2, 2026
Camrose, AB
Average peak power unavailable
12 kW maximum
First tracked May 2, 2026
Edmonton, AB
Average peak power unavailable
35 kW maximum
First tracked May 2, 2026
Vancouver, BC
Average peak power unavailable
350 kW maximum
First tracked May 2, 2026
Campbell River, BC
Average peak power unavailable
10 kW maximum
First tracked May 2, 2026
Vancouver, BC
Average peak power unavailable
63 kW maximum
First tracked May 2, 2026
Mississauga, ON
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Woodstock, ON
Average peak power unavailable
15 kW maximum
First tracked May 2, 2026
Mississauga, ON
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Spokane Valley, WA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Sequim, WA
Average peak power unavailable
12 kW maximum
First tracked May 2, 2026
Wapato, WA
Average peak power unavailable
8 kW maximum
First tracked May 2, 2026
Needham, MA
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
Framingham, MA
Average peak power unavailable
19 kW maximum
First tracked May 2, 2026
Epping, NH
Average peak power unavailable
125 kW maximum
First tracked May 2, 2026
Wheaton, IL
Average peak power unavailable
63 kW maximum
First tracked May 2, 2026
Posen, IL
Average peak power unavailable
7 kW maximum
First tracked May 2, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
THE ARCADIAN 31
Fort Lauderdale, FL
Operational First tracked May 4, 2026 |
Operational | — | 12 kW | May 4, 2026 |
|
RECHARGECO CONTRECŒUR 02
Contrecoeur, QC
Operational First tracked May 2, 2026 |
Operational | — | 350 kW | May 2, 2026 |
|
COMMERCE AVE STATION 6
Greencastle, PA
Unknown First tracked May 2, 2026 |
Unknown | — | 7 kW | May 2, 2026 |
|
WATERLOO FORD CHARGER
Edmonton, AB
Unknown First tracked May 2, 2026 |
Unknown | — | 40 kW | May 2, 2026 |
|
CAMROSE TOYOTA CAMROSE 2
Camrose, AB
Operational First tracked May 2, 2026 |
Operational | — | 12 kW | May 2, 2026 |
|
FREEDOM FORD CHARGER
Edmonton, AB
Operational First tracked May 2, 2026 |
Operational | — | 35 kW | May 2, 2026 |
|
MBB-CHARGEPOINT CPE PLUS
Vancouver, BC
Operational First tracked May 2, 2026 |
Operational | — | 350 kW | May 2, 2026 |
|
BROADSTREET CEDAR
Campbell River, BC
Operational First tracked May 2, 2026 |
Operational | — | 10 kW | May 2, 2026 |
|
MBB-CHARGEPOINT CPE
Vancouver, BC
Operational First tracked May 2, 2026 |
Operational | — | 63 kW | May 2, 2026 |
|
REXEL CORPORATE REXEL
Mississauga, ON
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
WOODSTOCKTOYOTA FRONT SHOP
Woodstock, ON
Operational First tracked May 2, 2026 |
Operational | — | 15 kW | May 2, 2026 |
|
CAWTHRA CC CAWTHRA CC
Mississauga, ON
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
LL THERAPY LLCFT
Spokane Valley, WA
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
SALISH SEASONS
Sequim, WA
Operational First tracked May 2, 2026 |
Operational | — | 12 kW | May 2, 2026 |
|
WAPATO 1 1
Wapato, WA
Operational First tracked May 2, 2026 |
Operational | — | 8 kW | May 2, 2026 |
|
ROSEMARY RIDGE STATION 1
Needham, MA
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |
|
FSU SALEM END MAPLE ST LOT 1
Framingham, MA
Operational First tracked May 2, 2026 |
Operational | — | 19 kW | May 2, 2026 |
|
REVISION ENERGY EPPING
Epping, NH
Operational First tracked May 2, 2026 |
Operational | — | 125 kW | May 2, 2026 |
|
DUPAGE CO DUPAGE CARE 1
Wheaton, IL
Unknown First tracked May 2, 2026 |
Unknown | — | 63 kW | May 2, 2026 |
|
POSEN HALL POSEN HALL
Posen, IL
Operational First tracked May 2, 2026 |
Operational | — | 7 kW | May 2, 2026 |