24,383
Sites
85
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

RECHARGECO CHELSEA 0

Chelsea, QC

Operational

Average peak power unavailable

125 kW maximum

First tracked Dec 21, 2024

GREENP CP53-00

Toronto, ON

Operational

Average peak power unavailable

63 kW maximum

First tracked Dec 21, 2024

UPMC FORBES TOWER

Pittsburgh, PA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 21, 2024

OBE REGENCY BCA PTE

Boca Raton, FL

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 21, 2024

NCDOT NCDOT DIV 14

Sylva, NC

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 21, 2024

RECHARGECO TÉMISCAMING 0

Témiscaming, QC

Operational Reliability A

88 kW avg peak

125 kW maximum

First tracked Dec 21, 2024

WINNETKA INDIAN HILLL

Winnetka, IL

Operational

Average peak power unavailable

15 kW maximum

First tracked Dec 21, 2024

SILVER SLIPPER SSCH

Bay St. Louis, MS

Operational

Average peak power unavailable

8 kW maximum

First tracked Dec 21, 2024

LIED LODGE

Nebraska City, NE

Operational

Average peak power unavailable

19 kW maximum

First tracked Dec 21, 2024

OBE HOUSTON GARGE

Fort Worth, TX

Operational

Average peak power unavailable

19 kW maximum

First tracked Dec 21, 2024

STATION

San Mateo, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 21, 2024

SMBC

San Mateo, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 21, 2024

CHARGEPT MAL1 CHARGER

Portland, OR

Operational

Average peak power unavailable

8 kW maximum

First tracked Dec 21, 2024

CHARGEPT MAL1 CHARGE

Portland, OR

Operational

Average peak power unavailable

8 kW maximum

First tracked Dec 21, 2024

LITCHFIELD MUNI

Litchfield, CT

Operational Reliability C

62 kW avg peak

63 kW maximum

First tracked Dec 20, 2024

DCAMM PSOB

Pittsfield, MA

Unknown

Average peak power unavailable

7 kW maximum

First tracked Dec 20, 2024

MONTMORENCYFORD PL 1

Brossard, QC

Operational Reliability B

178 kW avg peak

500 kW maximum

First tracked Dec 20, 2024

BW LAUREL BW LAUREL

Laurel, MD

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 20, 2024

GREENP CP11-00

Toronto, ON

Operational

Average peak power unavailable

19 kW maximum

First tracked Dec 20, 2024

Page 337 of 1220

This action cannot be undone.