Chelsea, QC
Average peak power unavailable
125 kW maximum
First tracked Dec 21, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Chelsea, QC
Average peak power unavailable
125 kW maximum
First tracked Dec 21, 2024
Toronto, ON
Average peak power unavailable
63 kW maximum
First tracked Dec 21, 2024
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Dec 21, 2024
Boca Raton, FL
Average peak power unavailable
7 kW maximum
First tracked Dec 21, 2024
Sylva, NC
Average peak power unavailable
7 kW maximum
First tracked Dec 21, 2024
Témiscaming, QC
88 kW avg peak
125 kW maximum
First tracked Dec 21, 2024
Winnetka, IL
Average peak power unavailable
15 kW maximum
First tracked Dec 21, 2024
Bay St. Louis, MS
Average peak power unavailable
8 kW maximum
First tracked Dec 21, 2024
Nebraska City, NE
Average peak power unavailable
19 kW maximum
First tracked Dec 21, 2024
Fort Worth, TX
Average peak power unavailable
19 kW maximum
First tracked Dec 21, 2024
San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 21, 2024
San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 21, 2024
Portland, OR
Average peak power unavailable
8 kW maximum
First tracked Dec 21, 2024
Portland, OR
Average peak power unavailable
8 kW maximum
First tracked Dec 21, 2024
Litchfield, CT
62 kW avg peak
63 kW maximum
First tracked Dec 20, 2024
Pittsfield, MA
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2024
Brossard, QC
178 kW avg peak
500 kW maximum
First tracked Dec 20, 2024
Laurel, MD
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2024
Washington, DC
Average peak power unavailable
7 kW maximum
First tracked Dec 20, 2024
Toronto, ON
Average peak power unavailable
19 kW maximum
First tracked Dec 20, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
RECHARGECO CHELSEA 0
Chelsea, QC
Operational First tracked Dec 21, 2024 |
Operational | — | 125 kW | Dec 21, 2024 |
|
GREENP CP53-00
Toronto, ON
Operational First tracked Dec 21, 2024 |
Operational | — | 63 kW | Dec 21, 2024 |
|
UPMC FORBES TOWER
Pittsburgh, PA
Operational First tracked Dec 21, 2024 |
Operational | — | 7 kW | Dec 21, 2024 |
|
OBE REGENCY BCA PTE
Boca Raton, FL
Operational First tracked Dec 21, 2024 |
Operational | — | 7 kW | Dec 21, 2024 |
|
NCDOT NCDOT DIV 14
Sylva, NC
Operational First tracked Dec 21, 2024 |
Operational | — | 7 kW | Dec 21, 2024 |
|
RECHARGECO TÉMISCAMING 0
Témiscaming, QC Reliability A Operational First tracked Dec 21, 2024 |
Operational | 88 kW | 125 kW | Dec 21, 2024 |
|
WINNETKA INDIAN HILLL
Winnetka, IL
Operational First tracked Dec 21, 2024 |
Operational | — | 15 kW | Dec 21, 2024 |
|
SILVER SLIPPER SSCH
Bay St. Louis, MS
Operational First tracked Dec 21, 2024 |
Operational | — | 8 kW | Dec 21, 2024 |
|
LIED LODGE
Nebraska City, NE
Operational First tracked Dec 21, 2024 |
Operational | — | 19 kW | Dec 21, 2024 |
|
OBE HOUSTON GARGE
Fort Worth, TX
Operational First tracked Dec 21, 2024 |
Operational | — | 19 kW | Dec 21, 2024 |
|
STATION
San Mateo, CA
Operational First tracked Dec 21, 2024 |
Operational | — | 7 kW | Dec 21, 2024 |
|
SMBC
San Mateo, CA
Operational First tracked Dec 21, 2024 |
Operational | — | 7 kW | Dec 21, 2024 |
|
CHARGEPT MAL1 CHARGER
Portland, OR
Operational First tracked Dec 21, 2024 |
Operational | — | 8 kW | Dec 21, 2024 |
|
CHARGEPT MAL1 CHARGE
Portland, OR
Operational First tracked Dec 21, 2024 |
Operational | — | 8 kW | Dec 21, 2024 |
|
LITCHFIELD MUNI
Litchfield, CT Reliability C Operational First tracked Dec 20, 2024 |
Operational | 62 kW | 63 kW | Dec 20, 2024 |
|
DCAMM PSOB
Pittsfield, MA
Unknown First tracked Dec 20, 2024 |
Unknown | — | 7 kW | Dec 20, 2024 |
|
MONTMORENCYFORD PL 1
Brossard, QC Reliability B Operational First tracked Dec 20, 2024 |
Operational | 178 kW | 500 kW | Dec 20, 2024 |
|
BW LAUREL BW LAUREL
Laurel, MD
Operational First tracked Dec 20, 2024 |
Operational | — | 7 kW | Dec 20, 2024 |
|
HILLWOOD MUSEUM PARKING_DECK
Washington, DC
Operational First tracked Dec 20, 2024 |
Operational | — | 7 kW | Dec 20, 2024 |
|
GREENP CP11-00
Toronto, ON
Operational First tracked Dec 20, 2024 |
Operational | — | 19 kW | Dec 20, 2024 |