24,383
Sites
85
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

WCWD DISTOFFICEFRONT

Richmond, CA

Operational

Average peak power unavailable

19 kW maximum

First tracked Dec 19, 2024

PILGRIM PARKING P

Cambridge, MA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 18, 2024

THE BOEING CO EDDYSTONE

Eddystone, PA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 18, 2024

THE BOEING CO MIAMI EV 1

Virginia Gardens, FL

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 18, 2024

GCDJ GURNEE CP6000

Gurnee, IL

Operational

Average peak power unavailable

19 kW maximum

First tracked Dec 18, 2024

THE BOEING CO STL 69-1

Berkeley, MO

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 18, 2024

THE BOEING CO STL 65-1

Berkeley, MO

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 18, 2024

THE BOEING CO STL 300

Hazelwood, MO

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 18, 2024

BH ENERGY BH STATION

Rapid City, SD

Operational

Average peak power unavailable

4 kW maximum

First tracked Dec 18, 2024

THE BOEING CO MESA

Mesa, AZ

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 18, 2024

Page 340 of 1220

This action cannot be undone.