Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Surrey, BC
Average peak power unavailable
8 kW maximum
First tracked Nov 24, 2024
Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Bellingham, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Redwood City, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Milwaukie, OR
141 kW avg peak
350 kW maximum
First tracked Nov 24, 2024
Milwaukie, OR
141 kW avg peak
350 kW maximum
First tracked Nov 24, 2024
Morton, WA
86 kW avg peak
125 kW maximum
First tracked Nov 24, 2024
Morton, WA
Average peak power unavailable
63 kW maximum
First tracked Nov 24, 2024
Tacoma, WA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
San Mateo, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Daly City, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Monterey, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Watsonville, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Portland, OR
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Novato, CA
169 kW avg peak
250 kW maximum
First tracked Nov 24, 2024
Healdsburg, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
Chico, CA
Average peak power unavailable
7 kW maximum
First tracked Nov 24, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
BELLINGHAM CITY WTA COR
Bellingham, WA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
CITY OF SURREY CLAYTONCC
Surrey, BC
Operational First tracked Nov 24, 2024 |
Operational | — | 8 kW | Nov 24, 2024 |
|
BELLINGHAM CITY BOULEVARD PARK1
Bellingham, WA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
YORK LOT STATION
Bellingham, WA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
BELLINGHAM CITY RAILROAD
Bellingham, WA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
YORK LOT WAYSTATION
Bellingham, WA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
HUDSON 333 TWIN STATION
Redwood City, CA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
PGE MEA
Milwaukie, OR Reliability A Operational First tracked Nov 24, 2024 |
Operational | 141 kW | 350 kW | Nov 24, 2024 |
|
PGE MEA DCFC 1
Milwaukie, OR Reliability A Unknown First tracked Nov 24, 2024 |
Unknown | 141 kW | 350 kW | Nov 24, 2024 |
|
LC TRANSIT MORTON E-T
Morton, WA Reliability D Operational First tracked Nov 24, 2024 |
Operational | 86 kW | 125 kW | Nov 24, 2024 |
|
ESD MORTON
Morton, WA
Operational First tracked Nov 24, 2024 |
Operational | — | 63 kW | Nov 24, 2024 |
|
TPS FACILITIES BRYANT ES
Tacoma, WA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
SMCCD CSM B18-LOT S
San Mateo, CA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
JEFFERSON
Daly City, CA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
MBM 1 STATION 1
Monterey, CA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
JACOB'S HEART
Watsonville, CA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
104 EV CHARGER
Portland, OR
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
EVROADWAY
Novato, CA Reliability A Unknown First tracked Nov 24, 2024 |
Unknown | 169 kW | 250 kW | Nov 24, 2024 |
|
PUBLIC 150 BRANCH LANE
Healdsburg, CA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |
|
MANGROVE PAC STATION 1
Chico, CA
Operational First tracked Nov 24, 2024 |
Operational | — | 7 kW | Nov 24, 2024 |