24,383
Sites
84
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

SVEC KIMBALL

Kimball, TN

Operational

Average peak power unavailable

125 kW maximum

First tracked Sep 21, 2024

ARTISAN LAKES STATION 1

Palmetto, FL

Operational

Average peak power unavailable

19 kW maximum

First tracked Sep 21, 2024

THE ASTER COMM ASTER1

Mesa, AZ

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 21, 2024

BV 4100 STATION 4

Folsom, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 21, 2024

TLCMP D

Poulsbo, WA

Operational

Average peak power unavailable

4 kW maximum

First tracked Sep 21, 2024

TLCMP

Poulsbo, WA

Operational

Average peak power unavailable

8 kW maximum

First tracked Sep 21, 2024

BERRY SUMMIT BERRY SUMMIT

Willow Creek, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 21, 2024

TCE AQ WIL TCE-BOWMAN-VT

Williston, VT

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 20, 2024

BURDICK BMW CP6K

Cicero, NY

Operational

Average peak power unavailable

12 kW maximum

First tracked Sep 20, 2024

TRILLIUM TYSONS TRILLIUM

McLean, VA

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 20, 2024

ROYAL CITY STATION 1

Guelph, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 20, 2024

NCG NCG

Social Circle, GA

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 20, 2024

ILLINI CHARGING C7 - EV3

Champaign, IL

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 20, 2024

FOX HOLLOW BLDG A

Edwards, CO

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 20, 2024

FOX HOLLOW BLDG K1

Edwards, CO

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 20, 2024

IRVINE CO OFC 610 NCD 0

Newport Beach, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 20, 2024

TLCMP

Poulsbo, WA

Operational

Average peak power unavailable

8 kW maximum

First tracked Sep 20, 2024

HEATHERWOOD

Terryville, NY

Operational

Average peak power unavailable

7 kW maximum

First tracked Sep 19, 2024

Page 396 of 1220

This action cannot be undone.