Groveland, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 27, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Groveland, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 27, 2024
Woodland, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 27, 2024
Sonoma, CA
49 kW avg peak
63 kW maximum
First tracked Aug 27, 2024
Sweet Home, OR
68 kW avg peak
63 kW maximum
First tracked Aug 27, 2024
Portland, OR
127 kW avg peak
350 kW maximum
First tracked Aug 27, 2024
Longmont, CO
Average peak power unavailable
63 kW maximum
First tracked Aug 25, 2024
Thousand Oaks, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 25, 2024
Beaverton, OR
133 kW avg peak
350 kW maximum
First tracked Aug 25, 2024
Braintree, MA
Average peak power unavailable
15 kW maximum
First tracked Aug 24, 2024
Middleborough, MA
Average peak power unavailable
125 kW maximum
First tracked Aug 24, 2024
Medford, MA
150 kW avg peak
350 kW maximum
First tracked Aug 24, 2024
Boston, MA
Average peak power unavailable
7 kW maximum
First tracked Aug 24, 2024
Farmington, CT
Average peak power unavailable
63 kW maximum
First tracked Aug 24, 2024
College Park, MD
Average peak power unavailable
7 kW maximum
First tracked Aug 24, 2024
Tysons, VA
Average peak power unavailable
7 kW maximum
First tracked Aug 24, 2024
Colonial Heights, VA
Average peak power unavailable
7 kW maximum
First tracked Aug 24, 2024
Mentor, OH
Average peak power unavailable
63 kW maximum
First tracked Aug 24, 2024
South Miami, FL
Average peak power unavailable
7 kW maximum
First tracked Aug 24, 2024
Peachtree City, GA
Average peak power unavailable
7 kW maximum
First tracked Aug 24, 2024
Murfreesboro, TN
Average peak power unavailable
19 kW maximum
First tracked Aug 24, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
GF4EVA RUSH CREEK L2
Groveland, CA
Operational First tracked Aug 27, 2024 |
Operational | — | 7 kW | Aug 27, 2024 |
|
YOLO COUNTY DCS CAMPUS
Woodland, CA
Operational First tracked Aug 27, 2024 |
Operational | — | 7 kW | Aug 27, 2024 |
|
BONNEAU MARKET BONNEAU MARKET
Sonoma, CA Reliability A Unknown First tracked Aug 27, 2024 |
Unknown | 49 kW | 63 kW | Aug 27, 2024 |
|
10TH AVENUE CPE250 #1
Sweet Home, OR Reliability A Operational First tracked Aug 27, 2024 |
Operational | 68 kW | 63 kW | Aug 27, 2024 |
|
PGE BEA DCFC
Portland, OR Reliability B Operational First tracked Aug 27, 2024 |
Operational | 127 kW | 350 kW | Aug 27, 2024 |
|
STEVINSON HYUND CPE250 1
Longmont, CO
Operational First tracked Aug 25, 2024 |
Operational | — | 63 kW | Aug 25, 2024 |
|
2000 CORPORATE 2000 CCD
Thousand Oaks, CA
Operational First tracked Aug 25, 2024 |
Operational | — | 7 kW | Aug 25, 2024 |
|
PGE BEA
Beaverton, OR Reliability B Operational First tracked Aug 25, 2024 |
Operational | 133 kW | 350 kW | Aug 25, 2024 |
|
QUIRK HYUNDAI CP6K 1
Braintree, MA
Operational First tracked Aug 24, 2024 |
Operational | — | 15 kW | Aug 24, 2024 |
|
MIDDLEBOROUGH JACKSON L3
Middleborough, MA
Operational First tracked Aug 24, 2024 |
Operational | — | 125 kW | Aug 24, 2024 |
|
SENTRYFORD PL
Medford, MA Reliability A Operational First tracked Aug 24, 2024 |
Operational | 150 kW | 350 kW | Aug 24, 2024 |
|
MCCA LOT ON D
Boston, MA
Operational First tracked Aug 24, 2024 |
Operational | — | 7 kW | Aug 24, 2024 |
|
CHRYSLER 1461 CJDR L3-B
Farmington, CT
Operational First tracked Aug 24, 2024 |
Operational | — | 63 kW | Aug 24, 2024 |
|
ATWORTHCP EV 2
College Park, MD
Operational First tracked Aug 24, 2024 |
Operational | — | 7 kW | Aug 24, 2024 |
|
CAPITAL ONE STATION N
Tysons, VA
Operational First tracked Aug 24, 2024 |
Operational | — | 7 kW | Aug 24, 2024 |
|
SOLD ROW LOYALTY TOYOTA
Colonial Heights, VA
Operational First tracked Aug 24, 2024 |
Operational | — | 7 kW | Aug 24, 2024 |
|
CLASSICTOYOTA CPE250 #1
Mentor, OH
Operational First tracked Aug 24, 2024 |
Operational | — | 63 kW | Aug 24, 2024 |
|
CLOISTERS MIAMI STATION 1
South Miami, FL
Operational First tracked Aug 24, 2024 |
Operational | — | 7 kW | Aug 24, 2024 |
|
PF PARKING LOT PACE LYNCH
Peachtree City, GA
Operational First tracked Aug 24, 2024 |
Operational | — | 7 kW | Aug 24, 2024 |
|
BEAMAN CP6000 LEFT
Murfreesboro, TN
Operational First tracked Aug 24, 2024 |
Operational | — | 19 kW | Aug 24, 2024 |