24,383
Sites
84
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

ADAMS V CENTER STATION

Adams, MA

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

RI OEAN STATION 1

Ocean Township, NJ

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

RI OEAN STATION 2

Ocean Township, NJ

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

APA MSD NORTH

Allentown, PA

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

LEGACY TWIN RVR TWIN RVR

Columbia, MD

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

MDTA NMB ADMIN CS-2B

Newburg, MD

Operational

Average peak power unavailable

12 kW maximum

First tracked Aug 22, 2024

STIRLING BASE STATION1

Marmora, ON

Unknown

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

INN RICHMOND STATION 3

Richmond, VA

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

ACURA PERFORM NIAGARA S1

St. Catharines, ON

Operational

Average peak power unavailable

12 kW maximum

First tracked Aug 22, 2024

ASHBURNHAM RAILYARD1

Peterborough, ON

Operational

Average peak power unavailable

19 kW maximum

First tracked Aug 22, 2024

GM EMPLOYEE CP EAST

Newmarket, ON

Operational

Average peak power unavailable

19 kW maximum

First tracked Aug 22, 2024

100 POPLAR SPACE

Erie, PA

Operational

Average peak power unavailable

8 kW maximum

First tracked Aug 22, 2024

OBE MARRIOTT GENEV

Geneva, OH

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

PARK 37 B300

Greenville, SC

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

PARK 37 B250

Greenville, SC

Operational

Average peak power unavailable

7 kW maximum

First tracked Aug 22, 2024

Page 410 of 1220

This action cannot be undone.