Brampton, ON
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Brampton, ON
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2024
Brampton, ON
Average peak power unavailable
63 kW maximum
First tracked Aug 13, 2024
Louisville, KY
Average peak power unavailable
7 kW maximum
First tracked Aug 13, 2024
Chicago, IL
Average peak power unavailable
15 kW maximum
First tracked Aug 13, 2024
Stockton, CA
Average peak power unavailable
13 kW maximum
First tracked Aug 13, 2024
Oakland, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 13, 2024
North Battleford, SK
Average peak power unavailable
7 kW maximum
First tracked Aug 11, 2024
Phoenix, AZ
Average peak power unavailable
7 kW maximum
First tracked Aug 11, 2024
Cloverdale, OR
Average peak power unavailable
8 kW maximum
First tracked Aug 11, 2024
Plymouth, MA
Average peak power unavailable
19 kW maximum
First tracked Aug 10, 2024
Woodbridge Township, NJ
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
Toronto, ON
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
Myrtle Beach, SC
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
Bay City, MI
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
Des Plaines, IL
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
Bethalto, IL
Average peak power unavailable
12 kW maximum
First tracked Aug 10, 2024
Campbell, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
Palo Alto, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
San Diego, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
Santa Rosa, CA
Average peak power unavailable
7 kW maximum
First tracked Aug 10, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
ALECTRA EV
Brampton, ON
Operational First tracked Aug 13, 2024 |
Operational | — | 63 kW | Aug 13, 2024 |
|
ALECTRA EV-7
Brampton, ON
Operational First tracked Aug 13, 2024 |
Operational | — | 63 kW | Aug 13, 2024 |
|
LG&E AB SAWYER PARK
Louisville, KY
Operational First tracked Aug 13, 2024 |
Operational | — | 7 kW | Aug 13, 2024 |
|
400 E RANDOLPH PLUG IN 2
Chicago, IL
Operational First tracked Aug 13, 2024 |
Operational | — | 15 kW | Aug 13, 2024 |
|
UOP CHARGERS UOP LOT 6 ZIP
Stockton, CA
Operational First tracked Aug 13, 2024 |
Operational | — | 13 kW | Aug 13, 2024 |
|
CITY OF OAKLAND HOWE ST
Oakland, CA
Operational First tracked Aug 13, 2024 |
Operational | — | 7 kW | Aug 13, 2024 |
|
NB TOYOTA NB TOYOTA
North Battleford, SK
Operational First tracked Aug 11, 2024 |
Operational | — | 7 kW | Aug 11, 2024 |
|
SOLARA VISTA STATION 3
Phoenix, AZ
Operational First tracked Aug 11, 2024 |
Operational | — | 7 kW | Aug 11, 2024 |
|
KINGFISHER APTS KING
Cloverdale, OR
Operational First tracked Aug 11, 2024 |
Operational | — | 8 kW | Aug 11, 2024 |
|
PLYMOUTH STEPHENS FIELD
Plymouth, MA
Operational First tracked Aug 10, 2024 |
Operational | — | 19 kW | Aug 10, 2024 |
|
RUSSO PHASE 2
Woodbridge Township, NJ
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |
|
GREENP CP304-001
Toronto, ON
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |
|
CCAR STATION 1 COASTAL 1
Myrtle Beach, SC
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |
|
MICHIGAN DEPART STATION
Bay City, MI
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |
|
EV STATION 1 EV STATION 1
Des Plaines, IL
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |
|
FARM FRESH SATION
Bethalto, IL
Operational First tracked Aug 10, 2024 |
Operational | — | 12 kW | Aug 10, 2024 |
|
AMPCAP 0977 CAMPBELL
Campbell, CA
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |
|
PALO ALTO PLACE EV
Palo Alto, CA
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |
|
DGS YTC P
San Diego, CA
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |
|
GRATON CASINO CHARGER
Santa Rosa, CA
Operational First tracked Aug 10, 2024 |
Operational | — | 7 kW | Aug 10, 2024 |