Silver Spring, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Silver Spring, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Arlington, VA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Arlington, VA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
College Park, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Silver Spring, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Silver Spring, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Silver Spring, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
College Park, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Arlington, VA
Average peak power unavailable
8 kW maximum
First tracked Jul 18, 2024
Arlington, VA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Arlington, VA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Baltimore, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Baltimore, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Baltimore, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Elkridge, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Silver Spring, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Laurel, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Columbia, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Baltimore, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
North Laurel, MD
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
MCDOT-PARKING GARAGE 9
Silver Spring, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
GEORGE MASON U VAN METRE
Arlington, VA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
ARLINGTON CO. MADISON
Arlington, VA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BOZZUTO CP TJS GARAGE
College Park, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
MCDOT-PARKING GARAGE 7
Silver Spring, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CENTRAL CENTRAL 3
Silver Spring, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
RCV RCV
Silver Spring, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BOZZUTO CP LVL 1 - EV 44
College Park, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
DEV EVSP DCA EV1-9
Arlington, VA
Operational First tracked Jul 18, 2024 |
Operational | — | 8 kW | Jul 18, 2024 |
|
PIEDMONT REALTY 4250 N FAIRFAX
Arlington, VA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
THE RIXEY STATION 1
Arlington, VA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
UM PTS PENN GARAGE 1
Baltimore, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
UM PTS PEARL #3
Baltimore, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
UM PTS PRATT
Baltimore, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
MTA MARC DORSEY 1
Elkridge, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
VILLA CORTESE
Silver Spring, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PATUXENT PLACE PATUXENT PLACE
Laurel, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
ORACLE MD
Columbia, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
UM PTS PRATT
Baltimore, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
HOWARD COUNTY LAUREL COM CNT
North Laurel, MD
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |