Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Irvine, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Costa Mesa, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Fullerton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Stanton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Fullerton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Fullerton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Fullerton, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Bellflower, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
BELLFLOWER, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
IRVINE CO OFC 1 PARK PLAZA 0
Irvine, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PARK PLACE PS5 STATION
Irvine, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
COAST COLLEGES
Costa Mesa, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CSU FULLERTON R1 - 04
Fullerton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
STANTON STATION 127
Stanton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 13&14
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 15&16
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PPH PPH 0
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
MAGIC PARKING DLH 0
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
S
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CSU FULLERTON CORP DR 0
Fullerton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CSU FULLERTON S10
Fullerton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PIXAR PALS PIXAR 32&33
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CSU FULLERTON GYM DR
Fullerton, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 4
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BELLFLOWER CITY S
Bellflower, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
HOWARD CDM THE EXCHANGE
BELLFLOWER, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 3
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 25&26
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SIMBA_2 SIMBA 17&18
Anaheim, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |