Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Burbank, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Huntington Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Costa Mesa, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Long Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Long Beach, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Long Beach, CA
Average peak power unavailable
12 kW maximum
First tracked Jul 18, 2024
Signal Hill, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Los Angeles, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Culver City, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Los Angeles, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Santa Monica, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Hawthorne, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
San Bernardino, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Los Angeles, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Santa Monica, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
Santa Monica, CA
Average peak power unavailable
7 kW maximum
First tracked Jul 18, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
BWP EV CHARGE MCCAMBRIDGE
Burbank, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
AVION BURBANK 3013-DUO
Burbank, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BWP EV CHARGE ONTARIO
Burbank, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
AVION O8 3029-DUO
Burbank, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
BWP EV CHARGE 201 CORNELL DR
Burbank, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
WIND RIVER PARK STATION 1
Huntington Beach, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CCCD CCCD 1
Costa Mesa, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SALES DETAIL CABE TOYOTA 01
Long Beach, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
PEDIATRIC VLG EV
Long Beach, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SALES DETAIL CPF50 1
Long Beach, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 12 kW | Jul 18, 2024 |
|
SIGNAL HILL LIBRARY
Signal Hill, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
6080 CENTER DR HHC
Los Angeles, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
C3 STATION
Culver City, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
6080 CENTER DR HHC9-6601
Los Angeles, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITY STATION MARINE PARK
Santa Monica, CA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |
|
HAWTHORNE1
Hawthorne, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
HOSPITAL 1805 MEDICAL
San Bernardino, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
6080 CENTER DR HHC18-6060
Los Angeles, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
SMC SSC LEVEL
Santa Monica, CA
Operational First tracked Jul 18, 2024 |
Operational | — | 7 kW | Jul 18, 2024 |
|
CITY STATION EV ARC
Santa Monica, CA
Unknown First tracked Jul 18, 2024 |
Unknown | — | 7 kW | Jul 18, 2024 |