Irvine, CA
49 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Irvine, CA
49 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Anaheim, CA
47 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Orange, CA
57 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Anaheim, CA
81 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Irvine, CA
62 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Fullerton, CA
Average peak power unavailable
63 kW maximum
First tracked Jun 19, 2024
Placentia, CA
52 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Carson, CA
42 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Downey, CA
Average peak power unavailable
63 kW maximum
First tracked Jun 19, 2024
Long Beach, CA
61 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Long Beach, CA
61 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Long Beach, CA
50 kW avg peak
40 kW maximum
First tracked Jun 19, 2024
Downey, CA
49 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Santa Ana, CA
51 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Long Beach, CA
Average peak power unavailable
63 kW maximum
First tracked Jun 19, 2024
Pomona, CA
50 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
Huntington Beach, CA
49 kW avg peak
40 kW maximum
First tracked Jun 19, 2024
Costa Mesa, CA
60 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
South El Monte, CA
Average peak power unavailable
63 kW maximum
First tracked Jun 19, 2024
Santa Ana, CA
65 kW avg peak
63 kW maximum
First tracked Jun 19, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
IRVINE COMPANY WOODBURY DCFC
Irvine, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 49 kW | 63 kW | Jun 19, 2024 |
|
H&S ENERGY H&S 2049
Anaheim, CA Reliability D Operational First tracked Jun 19, 2024 |
Operational | 47 kW | 63 kW | Jun 19, 2024 |
|
OCPW-PKGADMN
Orange, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 57 kW | 63 kW | Jun 19, 2024 |
|
WC ACURA CPE250
Anaheim, CA Reliability B Operational First tracked Jun 19, 2024 |
Operational | 81 kW | 63 kW | Jun 19, 2024 |
|
IRVINE CIV CTR
Irvine, CA Reliability B Operational First tracked Jun 19, 2024 |
Operational | 62 kW | 63 kW | Jun 19, 2024 |
|
CSU FULLERTON
Fullerton, CA
Operational First tracked Jun 19, 2024 |
Operational | — | 63 kW | Jun 19, 2024 |
|
G&M OIL G&M #115
Placentia, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 52 kW | 63 kW | Jun 19, 2024 |
|
KOC CPE250-1
Carson, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 42 kW | 63 kW | Jun 19, 2024 |
|
DOWNEYHYUNDAI CPE250
Downey, CA
Unknown First tracked Jun 19, 2024 |
Unknown | — | 63 kW | Jun 19, 2024 |
|
LONG BEACH NIETO DC 01
Long Beach, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 61 kW | 63 kW | Jun 19, 2024 |
|
LONG BEACH NIETO DC 02
Long Beach, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 61 kW | 63 kW | Jun 19, 2024 |
|
LONG BEACH GR
Long Beach, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 50 kW | 40 kW | Jun 19, 2024 |
|
G&M OIL CHEVRON #142
Downey, CA Reliability F Unknown First tracked Jun 19, 2024 |
Unknown | 49 kW | 63 kW | Jun 19, 2024 |
|
OCPW-PKGADMN P4
Santa Ana, CA Reliability B Operational First tracked Jun 19, 2024 |
Operational | 51 kW | 63 kW | Jun 19, 2024 |
|
G&M OIL CHEVRON #143
Long Beach, CA
Unknown First tracked Jun 19, 2024 |
Unknown | — | 63 kW | Jun 19, 2024 |
|
H&S ENERGY H&S#23 CHEVRON
Pomona, CA Reliability D Operational First tracked Jun 19, 2024 |
Operational | 50 kW | 63 kW | Jun 19, 2024 |
|
G&M OIL CHEVRON #183
Huntington Beach, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 49 kW | 40 kW | Jun 19, 2024 |
|
SOUTHCOASTPLAZA
Costa Mesa, CA Reliability A Operational First tracked Jun 19, 2024 |
Operational | 60 kW | 63 kW | Jun 19, 2024 |
|
H&S ENERGY H&S 2042
South El Monte, CA
Operational First tracked Jun 19, 2024 |
Operational | — | 63 kW | Jun 19, 2024 |
|
OCPW-PKGADMN P7 DC1 FAST
Santa Ana, CA Reliability A Unknown First tracked Jun 19, 2024 |
Unknown | 65 kW | 63 kW | Jun 19, 2024 |