Hallandale Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jun 5, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Hallandale Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jun 5, 2024
Cincinnati, OH
Average peak power unavailable
63 kW maximum
First tracked Jun 5, 2024
Dothan, AL
94 kW avg peak
125 kW maximum
First tracked Jun 5, 2024
Round Rock, TX
Average peak power unavailable
63 kW maximum
First tracked Jun 5, 2024
Barnstable, MA
Average peak power unavailable
7 kW maximum
First tracked Jun 4, 2024
Hyannis, MA
Average peak power unavailable
7 kW maximum
First tracked Jun 4, 2024
Laconia, NH
Average peak power unavailable
7 kW maximum
First tracked Jun 4, 2024
Wayne, PA
Average peak power unavailable
7 kW maximum
First tracked Jun 4, 2024
Ottawa, ON
Average peak power unavailable
7 kW maximum
First tracked Jun 4, 2024
Wedowee, AL
109 kW avg peak
500 kW maximum
First tracked Jun 4, 2024
Chicago, IL
Average peak power unavailable
7 kW maximum
First tracked Jun 4, 2024
Austin, TX
Average peak power unavailable
7 kW maximum
First tracked Jun 4, 2024
Laval, QC
Average peak power unavailable
7 kW maximum
First tracked Jun 3, 2024
Ann Arbor, MI
Average peak power unavailable
7 kW maximum
First tracked Jun 3, 2024
North Andover, MA
Average peak power unavailable
7 kW maximum
First tracked Jun 2, 2024
North Andover, MA
Average peak power unavailable
7 kW maximum
First tracked Jun 2, 2024
Shrewsbury, MA
Average peak power unavailable
7 kW maximum
First tracked Jun 2, 2024
Amherst, MA
Average peak power unavailable
7 kW maximum
First tracked Jun 2, 2024
Wildwood, NJ
Average peak power unavailable
7 kW maximum
First tracked Jun 2, 2024
Tarboro, NC
60 kW avg peak
40 kW maximum
First tracked Jun 2, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
COHB GITC
Hallandale Beach, FL
Operational First tracked Jun 5, 2024 |
Operational | — | 7 kW | Jun 5, 2024 |
|
M-B HUDSON MBOC FAST CHG
Cincinnati, OH
Operational First tracked Jun 5, 2024 |
Operational | — | 63 kW | Jun 5, 2024 |
|
DU ELECTRIC DOC
Dothan, AL Reliability B Operational First tracked Jun 5, 2024 |
Operational | 94 kW | 125 kW | Jun 5, 2024 |
|
ROUND ROCK HYUN INVENTORY
Round Rock, TX
Operational First tracked Jun 5, 2024 |
Operational | — | 63 kW | Jun 5, 2024 |
|
HHYANNIS STATION
Barnstable, MA
Operational First tracked Jun 4, 2024 |
Operational | — | 7 kW | Jun 4, 2024 |
|
HHYANNIS STATION 5
Hyannis, MA
Operational First tracked Jun 4, 2024 |
Operational | — | 7 kW | Jun 4, 2024 |
|
PRESCOTT FARM
Laconia, NH
Operational First tracked Jun 4, 2024 |
Operational | — | 7 kW | Jun 4, 2024 |
|
3RCC RCC3 #1
Wayne, PA
Operational First tracked Jun 4, 2024 |
Operational | — | 7 kW | Jun 4, 2024 |
|
SPRINGCRESS GURDWARA
Ottawa, ON
Operational First tracked Jun 4, 2024 |
Operational | — | 7 kW | Jun 4, 2024 |
|
ALLEN FOOD ALLEN FOOD 76
Wedowee, AL Reliability A Operational First tracked Jun 4, 2024 |
Operational | 109 kW | 500 kW | Jun 4, 2024 |
|
155 N WACKER DR P2 EV CHARGER
Chicago, IL
Operational First tracked Jun 4, 2024 |
Operational | — | 7 kW | Jun 4, 2024 |
|
BURNET FLATS BURNET FLATS G1
Austin, TX
Unknown First tracked Jun 4, 2024 |
Unknown | — | 7 kW | Jun 4, 2024 |
|
MAZDADELAVAL220 MAZDA CT2
Laval, QC
Operational First tracked Jun 3, 2024 |
Operational | — | 7 kW | Jun 3, 2024 |
|
A2 PARKS FULLER PARK
Ann Arbor, MI
Operational First tracked Jun 3, 2024 |
Operational | — | 7 kW | Jun 3, 2024 |
|
N ANDOVER SCHOOL ADMN 1+2
North Andover, MA
Operational First tracked Jun 2, 2024 |
Operational | — | 7 kW | Jun 2, 2024 |
|
N ANDOVER SENIOR CNTR
North Andover, MA
Operational First tracked Jun 2, 2024 |
Operational | — | 7 kW | Jun 2, 2024 |
|
PARKING LOT 1 MARKETPLACE
Shrewsbury, MA
Operational First tracked Jun 2, 2024 |
Operational | — | 7 kW | Jun 2, 2024 |
|
UMASS AMHERST LOT 65 L2
Amherst, MA
Operational First tracked Jun 2, 2024 |
Operational | — | 7 kW | Jun 2, 2024 |
|
CAP CENTER LIBRARY ST
Wildwood, NJ
Operational First tracked Jun 2, 2024 |
Operational | — | 7 kW | Jun 2, 2024 |
|
EMEMC HWY 33E EMEMC 1
Tarboro, NC Reliability B Operational First tracked Jun 2, 2024 |
Operational | 60 kW | 40 kW | Jun 2, 2024 |