Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Orange, CA
Average peak power unavailable
8 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
San Luis Obispo, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Riverside, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 7, 2026
Oak Grove, KY
Average peak power unavailable
4 kW maximum
First tracked Mar 6, 2026
Cartersville, GA
Average peak power unavailable
7 kW maximum
First tracked Mar 6, 2026
Sunnyvale, CA
Average peak power unavailable
12 kW maximum
First tracked Mar 6, 2026
Lincoln, ON
Average peak power unavailable
8 kW maximum
First tracked Mar 6, 2026
Shawano, WI
Average peak power unavailable
7 kW maximum
First tracked Mar 6, 2026
San Luis Obispo, CA
Average peak power unavailable
7 kW maximum
First tracked Mar 6, 2026
Livonia, MI
190 kW avg peak
500 kW maximum
First tracked Mar 6, 2026
Windsor, ON
Average peak power unavailable
12 kW maximum
First tracked Mar 6, 2026
River Forest, IL
85 kW avg peak
125 kW maximum
First tracked Mar 6, 2026
Concord, NC
Average peak power unavailable
19 kW maximum
First tracked Mar 6, 2026
Ardmore, PA
Average peak power unavailable
7 kW maximum
First tracked Mar 5, 2026
Hickory, NC
Average peak power unavailable
7 kW maximum
First tracked Mar 5, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
UC RIVERSIDE LOT 6 STATION
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
MAIN PLACE 187
Orange, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 8 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 15 STAT
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
CITY OF SLO CAD
San Luis Obispo, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 1 STATION
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 1 STATION 2
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
UC RIVERSIDE LOT 24 STATION
Riverside, CA
Operational First tracked Mar 7, 2026 |
Operational | — | 7 kW | Mar 7, 2026 |
|
HI HOPKINSVILLE HI EXPRESS
Oak Grove, KY
Operational First tracked Mar 6, 2026 |
Operational | — | 4 kW | Mar 6, 2026 |
|
HGICARTERSVILLE HGI
Cartersville, GA
Operational First tracked Mar 6, 2026 |
Operational | — | 7 kW | Mar 6, 2026 |
|
3V B2-29
Sunnyvale, CA
Operational First tracked Mar 6, 2026 |
Operational | — | 12 kW | Mar 6, 2026 |
|
TWENTY VALLEY CPF50
Lincoln, ON
Operational First tracked Mar 6, 2026 |
Operational | — | 8 kW | Mar 6, 2026 |
|
SAWYER
Shawano, WI
Operational First tracked Mar 6, 2026 |
Operational | — | 7 kW | Mar 6, 2026 |
|
CITY OF SLO CADPS
San Luis Obispo, CA
Operational First tracked Mar 6, 2026 |
Operational | — | 7 kW | Mar 6, 2026 |
|
GREAT LAKES EV LIVONIA DC
Livonia, MI Reliability A Operational First tracked Mar 6, 2026 |
Operational | 190 kW | 500 kW | Mar 6, 2026 |
|
NEXTSTAR N-11
Windsor, ON
Operational First tracked Mar 6, 2026 |
Operational | — | 12 kW | Mar 6, 2026 |
|
RIVER FOREST PAIRED
River Forest, IL Reliability B Operational First tracked Mar 6, 2026 |
Operational | 85 kW | 125 kW | Mar 6, 2026 |
|
OBE EMBASSY CONCO
Concord, NC
Operational First tracked Mar 6, 2026 |
Operational | — | 19 kW | Mar 6, 2026 |
|
COULTER PLACE
Ardmore, PA
Operational First tracked Mar 5, 2026 |
Operational | — | 7 kW | Mar 5, 2026 |
|
MJHTOYOTA LEVEL 2 CHARGER
Hickory, NC
Operational First tracked Mar 5, 2026 |
Operational | — | 7 kW | Mar 5, 2026 |