Moreno Valley, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Moreno Valley, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Boynton Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Boynton Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Tucson, AZ
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Malta, NY
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Manchester, VT
Average peak power unavailable
4 kW maximum
First tracked Jan 30, 2026
Malta, NY
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Walnut Creek, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Bethesda, MD
Average peak power unavailable
13 kW maximum
First tracked Jan 30, 2026
Mission, KS
Average peak power unavailable
10 kW maximum
First tracked Jan 30, 2026
Milpitas, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Berkeley, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Milpitas, CA
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Milpitas, CA
Average peak power unavailable
63 kW maximum
First tracked Jan 30, 2026
Durham, NC
Average peak power unavailable
7 kW maximum
First tracked Jan 30, 2026
Dallas, TX
Average peak power unavailable
19 kW maximum
First tracked Jan 30, 2026
Tempe, AZ
Average peak power unavailable
7 kW maximum
First tracked Jan 29, 2026
Moreno Valley, CA
Average peak power unavailable
63 kW maximum
First tracked Jan 29, 2026
Boynton Beach, FL
Average peak power unavailable
7 kW maximum
First tracked Jan 29, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
CITY HALL CORPORATE YARD6
Moreno Valley, CA
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
WSL SOUTH CONGR STATION 1 BLD 2
Boynton Beach, FL
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
WSL SOUTH CONGR STATION 5 BLD 1
Boynton Beach, FL
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
CFA 05676 CFA #05676 1
Tucson, AZ
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
CFA 05676 CFA #05676
Tucson, AZ
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
GLOBALFOUNDRIES GF 1
Malta, NY
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
POOL AREA STATION
Manchester, VT
Operational First tracked Jan 30, 2026 |
Operational | — | 4 kW | Jan 30, 2026 |
|
GLOBALFOUNDRIES GF 11&12
Malta, NY
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
CFA 05340 OAK GROVE
Walnut Creek, CA
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
THE GRANDVIEW STATION 1
Bethesda, MD
Operational First tracked Jan 30, 2026 |
Operational | — | 13 kW | Jan 30, 2026 |
|
EVERGY @HY VEE-010A
Mission, KS
Operational First tracked Jan 30, 2026 |
Operational | — | 10 kW | Jan 30, 2026 |
|
HQ STATION 5 MDO 1
Milpitas, CA
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
ALTABATESSUMMIT SHATTUCK LOT 10
Berkeley, CA
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
HQ STATION 5 MDO 2
Milpitas, CA
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
HQ STATION 5 EXPRESS 250
Milpitas, CA
Operational First tracked Jan 30, 2026 |
Operational | — | 63 kW | Jan 30, 2026 |
|
MACOM HQ STATION 2
Durham, NC
Operational First tracked Jan 30, 2026 |
Operational | — | 7 kW | Jan 30, 2026 |
|
OBE BLUFFVIEW APTS
Dallas, TX
Operational First tracked Jan 30, 2026 |
Operational | — | 19 kW | Jan 30, 2026 |
|
ORCHIDHOUSE S
Tempe, AZ
Operational First tracked Jan 29, 2026 |
Operational | — | 7 kW | Jan 29, 2026 |
|
CITY HALL CORPORATE YARD
Moreno Valley, CA
Operational First tracked Jan 29, 2026 |
Operational | — | 63 kW | Jan 29, 2026 |
|
WSL SOUTH CONGR STATION
Boynton Beach, FL
Operational First tracked Jan 29, 2026 |
Operational | — | 7 kW | Jan 29, 2026 |