Detroit, MI
Average peak power unavailable
7 kW maximum
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
63 kW avg peak
63 kW maximum
Detroit, MI
50 kW avg peak
63 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
Detroit, MI
Average peak power unavailable
7 kW maximum
White Lake charter Township, MI
Average peak power unavailable
7 kW maximum
Royal Oak, MI
Average peak power unavailable
7 kW maximum
Royal Oak, MI
Average peak power unavailable
7 kW maximum
Waterford Township, MI
Average peak power unavailable
7 kW maximum
Waterford Township, MI
Average peak power unavailable
7 kW maximum
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
LVB CHARGER 1
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
HOTEL CHARGERS HOTEL #1
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
HOTEL CHARGERS HOTEL #2
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
BLUE ENERGY 1 BEACON PARK DC
Detroit, MI Reliability C Operational |
Operational | 63 kW | 63 kW | — |
|
BLUE ENERGY 1 BEACON PARK DC4
Detroit, MI Reliability B Operational |
Operational | 50 kW | 63 kW | — |
|
CCA CBD DETROIT STATION
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
HFHS HF CANCER CTR
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
HFHS HF PALLISTER
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
HFHS HF PALLISTER 3
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
HFHS HF PALLISTER
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
BEDROCK 124 ALF GRG 1-1
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
HFHS ONE FORD CT4K
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
BEDROCK NEW CENTER 1
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
BEDROCK CASS 2
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
DET INST OF ART EV STATION 0
Detroit, MI
Operational |
Operational | — | 7 kW | — |
|
WALLED LAKE DUBLIN
White Lake charter Township, MI
Operational |
Operational | — | 7 kW | — |
|
CCAROY ROYAL OAK-WEST
Royal Oak, MI
Operational |
Operational | — | 7 kW | — |
|
LAG CT4000
Royal Oak, MI
Operational |
Operational | — | 7 kW | — |
|
PTK TERM OCIA TERMINAL
Waterford Township, MI
Operational |
Operational | — | 7 kW | — |
|
PEARLE VISION PEARLE VISION 1
Waterford Township, MI
Operational |
Operational | — | 7 kW | — |