Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Rivian Roamer is now Roamer! It moved from rivianroamer.com to evroamer.com.
DetailsWhat changedLink your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Laval, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
7 kW maximum
First tracked Jan 10, 2025
Montréal, QC
Average peak power unavailable
6 kW maximum
First tracked Jan 10, 2025
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
METRO - Fleury
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
3043 | BSR | RPP | 3985 Masson
Montréal, QC
Unknown First tracked Jan 10, 2025 |
Unknown | — | 6 kW | Jan 10, 2025 |
|
Hydro-Québec - Poste Duvernay (priv
Laval, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
1026 | BSR | AC | 2425 Gouin E. - Parc de la Visitation
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
12006 | BBHR | SLE | 5555 Jean-Talon Est
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
Niveau 2 St-André/Villeray
Montréal, QC
Unknown First tracked Jan 10, 2025 |
Unknown | — | 7 kW | Jan 10, 2025 |
|
1024 | BSR | AC | 1110 Sauv
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
5022 | BSR | PMR | 4490 Fabre
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
1006 | BSR | AC | 1780 Fleury
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
7 15006 | BSR | LAC | 2105 St-Joseph
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
6028 | BSR | VM | 2330 Sherbrooke Ouest
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
6052 | BSR | VM | 2368 Place Dufresne
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
2017 | BSR | VSMPE | 7877 Foucher
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
3031 | BSR | RPP | 6679 Rue Garnier
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
6062 | BSR | VM | 1155 Bishop
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
2025 | BSR | VSMPE | 7352 Drolet
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
1010 | BSR | AC | 9699 Foucher
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
3022 | BSR | RPP | 2900 Masson
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |
|
5004 | BSR | PMR | 3046 Jeanne-Mance
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 7 kW | Jan 10, 2025 |
|
4029 | BSR | MHM | 2580 Pierre-Bernard
Montréal, QC
Operational First tracked Jan 10, 2025 |
Operational | — | 6 kW | Jan 10, 2025 |