South Pasadena, CA
Average peak power unavailable
350 kW maximum
First tracked Jun 24, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
South Pasadena, CA
Average peak power unavailable
350 kW maximum
First tracked Jun 24, 2026
Dansville, NY
Average peak power unavailable
350 kW maximum
First tracked Jun 24, 2026
Springfield, MO
Average peak power unavailable
350 kW maximum
First tracked Jun 18, 2026
Santa Barbara, CA
201 kW avg peak
350 kW maximum
First tracked Jun 17, 2026
Sunnyside, NY
Average peak power unavailable
350 kW maximum
First tracked Jun 15, 2026
Midvale, UT
Average peak power unavailable
350 kW maximum
First tracked Jun 10, 2026
Capistrano Beach, CA
203 kW avg peak
350 kW maximum
First tracked Jun 9, 2026
Live Oak, TX
Average peak power unavailable
350 kW maximum
First tracked Jun 9, 2026
Kent, OH
Average peak power unavailable
350 kW maximum
First tracked Jun 6, 2026
Towson, MD
203 kW avg peak
350 kW maximum
First tracked May 29, 2026
Fayetteville, NC
206 kW avg peak
350 kW maximum
First tracked May 28, 2026
Homewood, IL
205 kW avg peak
350 kW maximum
First tracked May 22, 2026
Salem, MA
184 kW avg peak
350 kW maximum
First tracked May 22, 2026
Chicago, IL
Average peak power unavailable
350 kW maximum
First tracked May 21, 2026
Muncy, PA
205 kW avg peak
350 kW maximum
First tracked May 18, 2026
Winston-Salem, NC
193 kW avg peak
350 kW maximum
First tracked May 14, 2026
Visalia, CA
209 kW avg peak
350 kW maximum
First tracked May 8, 2026
Rosedale, NY
Average peak power unavailable
350 kW maximum
First tracked May 8, 2026
St. Louis, MO
203 kW avg peak
350 kW maximum
First tracked May 7, 2026
Lincoln, CA
Average peak power unavailable
3 kW maximum
First tracked Apr 30, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
BOA CA9-164 (South Pasadena, CA)
South Pasadena, CA
Operational First tracked Jun 24, 2026 |
Operational | — | 350 kW | Jun 24, 2026 |
|
EVolve NY Dansville
Dansville, NY
Operational First tracked Jun 24, 2026 |
Operational | — | 350 kW | Jun 24, 2026 |
|
Target T1031 (Springfield, MO)
Springfield, MO
Operational First tracked Jun 18, 2026 |
Operational | — | 350 kW | Jun 18, 2026 |
|
Carrillo Street Station (Santa Barbara, CA)
Santa Barbara, CA Reliability A Operational First tracked Jun 17, 2026 |
Operational | 201 kW | 350 kW | Jun 17, 2026 |
|
EVolve NY Sunnyside Municipal
Sunnyside, NY
Operational First tracked Jun 15, 2026 |
Operational | — | 350 kW | Jun 15, 2026 |
|
RMP Midvale (Midvale, UT)
Midvale, UT
Operational First tracked Jun 10, 2026 |
Operational | — | 350 kW | Jun 10, 2026 |
|
Dana Point Station (Dana Point, CA)
Capistrano Beach, CA Reliability A Operational First tracked Jun 9, 2026 |
Operational | 203 kW | 350 kW | Jun 9, 2026 |
|
IKEA Store 570 (Live Oak, TX)
Live Oak, TX
Operational First tracked Jun 9, 2026 |
Operational | — | 350 kW | Jun 9, 2026 |
|
Menards Kent 3371 (Kent, OH)
Kent, OH
Operational First tracked Jun 6, 2026 |
Operational | — | 350 kW | Jun 6, 2026 |
|
Royal Farms 019 (Towson, MD)
Towson, MD Reliability B Operational First tracked May 29, 2026 |
Operational | 203 kW | 350 kW | May 29, 2026 |
|
Target T0755 (Fayetteville, NC)
Fayetteville, NC Reliability B Operational First tracked May 28, 2026 |
Operational | 206 kW | 350 kW | May 28, 2026 |
|
Menards Homewood 3345 (Homewood, IL)
Homewood, IL Reliability A Operational First tracked May 22, 2026 |
Operational | 205 kW | 350 kW | May 22, 2026 |
|
Highland Avenue Shopping Center (Salem, MA)
Salem, MA Reliability A Operational First tracked May 22, 2026 |
Operational | 184 kW | 350 kW | May 22, 2026 |
|
Marshfield Plaza (Chicago, IL)
Chicago, IL
Operational First tracked May 21, 2026 |
Operational | — | 350 kW | May 21, 2026 |
|
Sheetz Muncy, powered by Electrify America
Muncy, PA Reliability A Operational First tracked May 18, 2026 |
Operational | 205 kW | 350 kW | May 18, 2026 |
|
Target T1086 (Winston-Salem, NC)
Winston-Salem, NC Reliability B Operational First tracked May 14, 2026 |
Operational | 193 kW | 350 kW | May 14, 2026 |
|
Costco Visalia (Visalia, CA)
Visalia, CA Reliability B Operational First tracked May 8, 2026 |
Operational | 209 kW | 350 kW | May 8, 2026 |
|
EVolve NY Rosedale Municipal
Rosedale, NY
Operational First tracked May 8, 2026 |
Operational | — | 350 kW | May 8, 2026 |
|
RPT Heritage Place (St. Louis, MO)
St. Louis, MO Reliability C Operational First tracked May 7, 2026 |
Operational | 203 kW | 350 kW | May 7, 2026 |
|
Lincoln MOB
Lincoln, CA
Unknown First tracked Apr 30, 2026 |
Unknown | — | 3 kW | Apr 30, 2026 |