Squamish, BC
Unknown
Average peak power unavailable
400 kW maximum
First tracked Sep 22, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Squamish, BC
Average peak power unavailable
400 kW maximum
First tracked Sep 22, 2026
Pitt Meadows, BC
Average peak power unavailable
400 kW maximum
First tracked Oct 16, 2026
| Location | Status | Avg peak power | Max power | First tracked ↑ |
|---|---|---|---|---|
|
Squamish MB.HPC
Squamish, BC
Unknown First tracked Sep 22, 2026 |
Unknown | — | 400 kW | Sep 22, 2026 |
|
2 Meadow Vale Shopping Centre MB.HPC
Pitt Meadows, BC
Operational First tracked Oct 16, 2026 |
Operational | — | 400 kW | Oct 16, 2026 |