Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Pittsburgh, PA
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Youngstown, OH
Average peak power unavailable
19 kW maximum
First tracked Dec 5, 2024
Wellesley, ON
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
West Lafayette, IN
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Washington, MO
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Kansas City, MO
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Calgary, AB
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
South Jordan, UT
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Anaheim, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Carson, CA
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Spokane, WA
Average peak power unavailable
7 kW maximum
First tracked Dec 5, 2024
Torrance, CA
Average peak power unavailable
15 kW maximum
First tracked Dec 5, 2024
Bellingham, WA
86 kW avg peak
125 kW maximum
First tracked Dec 5, 2024
Middleton, NS
Average peak power unavailable
63 kW maximum
First tracked Dec 4, 2024
Ithaca, NY
Average peak power unavailable
10 kW maximum
First tracked Dec 4, 2024
Toronto, ON
Average peak power unavailable
7 kW maximum
First tracked Dec 4, 2024
Springdale, OH
Average peak power unavailable
4 kW maximum
First tracked Dec 4, 2024
Grayslake, IL
Average peak power unavailable
7 kW maximum
First tracked Dec 4, 2024
Cameron, LA
Average peak power unavailable
7 kW maximum
First tracked Dec 4, 2024
Manhattan, KS
Average peak power unavailable
19 kW maximum
First tracked Dec 4, 2024
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
FNB GARAGE FNB GARAGE
Pittsburgh, PA
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
COCHRANAUTO BOARDMANFORD L2
Youngstown, OH
Operational First tracked Dec 5, 2024 |
Operational | — | 19 kW | Dec 5, 2024 |
|
TWP WELLESLEY STATION 1
Wellesley, ON
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
THE VIBE STATION
West Lafayette, IN
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
CT4021 ASC PARKING LOT
Washington, MO
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
BOULEVARD BLVD BREWERY
Kansas City, MO
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
EAU CLAIRE EAU CLAIRE
Calgary, AB
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
CITY HALL STATION 64
South Jordan, UT
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
THE VIV HOTEL STATION
Anaheim, CA
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
CSG EV CARSO
Carson, CA
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
SIA SIA/LOT C
Spokane, WA
Operational First tracked Dec 5, 2024 |
Operational | — | 7 kW | Dec 5, 2024 |
|
CTKLUTHERAN CTKLUTHERAN
Torrance, CA
Operational First tracked Dec 5, 2024 |
Operational | — | 15 kW | Dec 5, 2024 |
|
BELLINGHAM CITY CAROLINA
Bellingham, WA Reliability B Operational First tracked Dec 5, 2024 |
Operational | 86 kW | 125 kW | Dec 5, 2024 |
|
BRUCEGROUP GM-L3-1
Middleton, NS
Operational First tracked Dec 4, 2024 |
Operational | — | 63 kW | Dec 4, 2024 |
|
GREENSTARCOOPER GREENSTAR 2
Ithaca, NY
Operational First tracked Dec 4, 2024 |
Operational | — | 10 kW | Dec 4, 2024 |
|
60 BIRMINGHAM EV 3
Toronto, ON
Operational First tracked Dec 4, 2024 |
Operational | — | 7 kW | Dec 4, 2024 |
|
MAPLE MANOR MKV STATION
Springdale, OH
Operational First tracked Dec 4, 2024 |
Operational | — | 4 kW | Dec 4, 2024 |
|
GCHS EAST LOT CENTRAL
Grayslake, IL
Operational First tracked Dec 4, 2024 |
Operational | — | 7 kW | Dec 4, 2024 |
|
VGLNG STATION 1
Cameron, LA
Operational First tracked Dec 4, 2024 |
Operational | — | 7 kW | Dec 4, 2024 |
|
ATC SOUTH STATION 1
Manhattan, KS
Operational First tracked Dec 4, 2024 |
Operational | — | 19 kW | Dec 4, 2024 |