24,383
Sites
85
Avg peak power

See your own charging sessions

Link your Rivian account and get Roamer Plus to keep every charging session: full charging curves, costs, and session history.

Join & Connect
Reliability Distribution
A: 2% B: 3% C: 1%

Sites

Average peak power and reliability grades are reported by Rivian.

GPM INVESTMENTS 4581 DC

Aurora, CO

Operational Reliability B

93 kW avg peak

160 kW maximum

First tracked Dec 4, 2024

HENSLEY AT THE HENSLEY

Centennial, CO

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

GPM INVESTMENTS 4588 DC

Colorado Springs, CO

Operational Reliability A

104 kW avg peak

160 kW maximum

First tracked Dec 4, 2024

CHASE CENTER P

San Francisco, CA

Operational

Average peak power unavailable

19 kW maximum

First tracked Dec 4, 2024

TOL REDWDS PUBLIC 1

Langley Township, BC

Operational

Average peak power unavailable

8 kW maximum

First tracked Dec 4, 2024

CFA 05192 CFAWOODBURN1

Woodburn, OR

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

CFA 05192 CFAWOODBURN2

Woodburn, OR

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 4, 2024

HOLY CROSS HOGAN LOT

Worcester, MA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 3, 2024

HOLY CROSS HOGAN LOT 2

Worcester, MA

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 3, 2024

241741036313 RANSOM'S

Desloge, MO

Operational

Average peak power unavailable

7 kW maximum

First tracked Dec 3, 2024

IAD214 IAD214 STATION

Sterling, VA

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 30, 2024

60 BIRMINGHAM EV 1

Toronto, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 30, 2024

BLVD MASTER STERLING

Dublin, CA

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 30, 2024

GG MONDE MONDE-VISITORS

Toronto, ON

Operational

Average peak power unavailable

7 kW maximum

First tracked Nov 29, 2024

60 BIRMINGHAM EV 2

Toronto, ON

Unknown

Average peak power unavailable

7 kW maximum

First tracked Nov 28, 2024

Page 348 of 1220

This action cannot be undone.