Charlotte, NC
59 kW avg peak
500 kW maximum
First tracked May 8, 2026
Link your Rivian account to keep every charging session: full charging curves, costs, and session history.
Average peak power and reliability grades are reported by Rivian.
Charlotte, NC
59 kW avg peak
500 kW maximum
First tracked May 8, 2026
Orlando, FL
197 kW avg peak
400 kW maximum
First tracked Apr 13, 2026
St Johnsbury, VT
197 kW avg peak
400 kW maximum
First tracked Mar 28, 2026
Bangor, ME
205 kW avg peak
400 kW maximum
First tracked Mar 28, 2026
Elmira, NY
204 kW avg peak
400 kW maximum
First tracked Mar 28, 2026
Lansing, MI
200 kW avg peak
400 kW maximum
First tracked Mar 28, 2026
Ridgefield, WA
204 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Manchester, NH
Average peak power unavailable
400 kW maximum
First tracked Mar 26, 2026
Methuen, MA
204 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Braintree, MA
202 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Holyoke, MA
Average peak power unavailable
400 kW maximum
First tracked Mar 26, 2026
Saco, ME
187 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Peabody, MA
Average peak power unavailable
400 kW maximum
First tracked Mar 26, 2026
Kittery, ME
184 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Lee, MA
186 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Copley, OH
203 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Washington, PA
192 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Phoenix, OR
Average peak power unavailable
400 kW maximum
First tracked Mar 26, 2026
Red Bluff, CA
211 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
Clinton, CT
196 kW avg peak
400 kW maximum
First tracked Mar 26, 2026
| Location | Status | Avg peak power | Max power | First tracked ↓ |
|---|---|---|---|---|
|
Alpitronic Test EVSE - NOT FOR PUBLIC
Charlotte, NC Reliability B Operational First tracked May 8, 2026 |
Operational | 59 kW | 500 kW | May 8, 2026 |
|
Orlando Lake Nona MP.HPC
Orlando, FL Reliability A Operational First tracked Apr 13, 2026 |
Operational | 197 kW | 400 kW | Apr 13, 2026 |
|
St Johnsbury MB.HPC
St Johnsbury, VT Reliability A Operational First tracked Mar 28, 2026 |
Operational | 197 kW | 400 kW | Mar 28, 2026 |
|
Bangor MB.HPC
Bangor, ME Reliability A Operational First tracked Mar 28, 2026 |
Operational | 205 kW | 400 kW | Mar 28, 2026 |
|
Elmira MB.HPC
Elmira, NY Reliability B Operational First tracked Mar 28, 2026 |
Operational | 204 kW | 400 kW | Mar 28, 2026 |
|
Eastwood Towne Center MB.HPC
Lansing, MI Reliability B Operational First tracked Mar 28, 2026 |
Operational | 200 kW | 400 kW | Mar 28, 2026 |
|
Starbucks Ridgefield MB.HPC
Ridgefield, WA Reliability B Operational First tracked Mar 26, 2026 |
Operational | 204 kW | 400 kW | Mar 26, 2026 |
|
The Mall of New Hampshire MB.HPC
Manchester, NH
Operational First tracked Mar 26, 2026 |
Operational | — | 400 kW | Mar 26, 2026 |
|
Methuen MB.HPC
Methuen, MA Reliability B Operational First tracked Mar 26, 2026 |
Operational | 204 kW | 400 kW | Mar 26, 2026 |
|
Braintree MB.HPC
Braintree, MA Reliability B Operational First tracked Mar 26, 2026 |
Operational | 202 kW | 400 kW | Mar 26, 2026 |
|
Holyoke MB.HPC
Holyoke, MA
Operational First tracked Mar 26, 2026 |
Operational | — | 400 kW | Mar 26, 2026 |
|
Industrial Park Saco MB.HPC
Saco, ME Reliability B Operational First tracked Mar 26, 2026 |
Operational | 187 kW | 400 kW | Mar 26, 2026 |
|
Peabody M
Peabody, MA
Operational First tracked Mar 26, 2026 |
Operational | — | 400 kW | Mar 26, 2026 |
|
Kittery Premium Outlets MB.HPC
Kittery, ME Reliability B Operational First tracked Mar 26, 2026 |
Operational | 184 kW | 400 kW | Mar 26, 2026 |
|
Lee Premium Outlets MB.HPC
Lee, MA Reliability A Operational First tracked Mar 26, 2026 |
Operational | 186 kW | 400 kW | Mar 26, 2026 |
|
Copley MB.HPC
Copley, OH Reliability A Operational First tracked Mar 26, 2026 |
Operational | 203 kW | 400 kW | Mar 26, 2026 |
|
The Old Mill Washington MB.HPC
Washington, PA Reliability B Operational First tracked Mar 26, 2026 |
Operational | 192 kW | 400 kW | Mar 26, 2026 |
|
Starbucks Phoenix MB.HPC
Phoenix, OR
Operational First tracked Mar 26, 2026 |
Operational | — | 400 kW | Mar 26, 2026 |
|
Starbucks Red Bluff MB.HPC
Red Bluff, CA Reliability B Operational First tracked Mar 26, 2026 |
Operational | 211 kW | 400 kW | Mar 26, 2026 |
|
Clinton Premium Outlets MB.HPC
Clinton, CT Reliability C Operational First tracked Mar 26, 2026 |
Operational | 196 kW | 400 kW | Mar 26, 2026 |